Regulus RGMAT E G60 Скачать руководство пользователя страница 8

 

 

SMĚR PROUDĚNÍ

 

 

 

SMĚR PROUDĚNÍ

 

 

SMĚR PROUDĚNÍ

 

6. Installation options

This Load Unit comes in the version for horizontal installation to the right of a boiler. However, it can be

installed also into vertical piping or horizontally to the left of a boiler. When being installed horizontally

to the left of a boiler, the Load Unit needs to be turned by 180° and the TSV3B valve turned as shown 

in the pics below.

©2022 We reserve the right to errors, changes and improvements without prior notice.

REGULUS spol. s r.o.

E-mail: [email protected]

Web: www.regulus.eu

v1.0-04/2022

FLOW DIRECTION

FLOW DIRECTION

FLOW DIRECTION

Содержание RGMAT E G60

Страница 1: ...www regulus eu RGMAT E G60 RGMAT E G60 EN Installation and Operation Manual RegulusRGMAT E G60 LOAD UNIT with UPM 3 insulated for heating systems...

Страница 2: ...es it prevents low temperature corrosion and boiler fire fouling Description consists of a UPM3 FLEX AS pump ball valves with union nuts TSV3B valve with automatic bypass balancing thermometer insulat...

Страница 3: ...may hinder or even disable its operation Always respect valid rules and boiler manufacturer s data during installation Possible Connection Example I The diagram shows a typical connection of a solid...

Страница 4: ...nlet limiting so the hot water flow coming from the bypass till its complete tight closure Thanks to this no balancing valve is needed The load valve is made of brass element and plug seals are in EPD...

Страница 5: ...t needed Pump control The circulation pump can be controlled by an external PWM signal profile for use in heating systems or without a PWM signal by selecting a pump performance curve A maximum curve...

Страница 6: ...n the pump runs at factory settings or the last setting The display shows the current pump performance Setting selection for UPM3 To select your desired setting press the button repeatedly until you f...

Страница 7: ...Pump wiring socket for power supply A and signal transmission B power supply A and signal B connectors N brown L brown PE yellow green PWM GDN blue PWM out black PWM in brown Permissible positions...

Страница 8: ...iping or horizontally to the left of a boiler When being installed horizontally to the left of a boiler the Load Unit needs to be turned by 180 and the TSV3B valve turned as shown in the pics below 20...

Отзывы: