6 - Installation and Commissioning

Installation must meet valid rules and may be done only by qualified staff.

Defects caused by improper installation, use or handling are not covered by warranty.

After the tank is installed and connected to an existing heating system, it is recommended to clean the entire 

heating system using a suitable cleaning agent, e.g. MR-501/R.

Anti-corrosion protective liquid should be also used, e.g. MR-501/F.

6.1 - Connection to heat sources 

Hang the tank on the wall as close as possible to the heat source (minimum height of the tank from the floor must 

be at least 650 mm when a 7.5 kW heating element is installed). Connect the heat source and heating system to 

the inlets and outlets. Install an air vent valve at the highest point of the system. Insulate all the connecting piping.

6.2 - El. heating element installation

The thermal store can be equipped with an electric heating element without a thermostatic head (e.g. ETT-A), up to 

7.5 kW output with a maximum length of 635 mm.  

An electric heating elements without thermostatic head shall be protected by a safety thermostat.

The installation may be done by qualified staff only. 

6.3 - Commissioning

The tank shall be filled up together with the heating system, respecting valid standards and rules. In order to minimize 

corrosion, special additives for heating systems should be used, e.g. MR-501/F. The quality of heating water, top-up 

water and the frequency of topping up has a strong influence on the lifetime of the heating system. Poor quality of 

heating water may cause problems like corrosion or incrustation.

Fill the entire system with the heating fluid and air-bleed it. Check all connections for leaks and verify the system 

pressure. Set the parameters of the used controller in compliance with the documentation and manufacturer’s 

recommendations. Check regularly the proper function of all control and adjustment elements.

Содержание PS 80 Z

Страница 1: ...www regulus eu PS 80 Z PS 80 Z EN Installation and Operation Manual WALL HUNG THERMAL STORE PS 80 Z...

Страница 2: ...3 2 General Information 3 3 Technical Data and Dimensions of P 80 Z Tank 4 4 Operation 5 5 Examples of Assigning Connection Points 5 6 Installation and Commissioning 6 6 1 Connection to heat sources 6...

Страница 3: ...rce and heating system 1x G 1 2 F connection for air vent valve 1x G 6 4 F connection for installing an electric heating element 2x sensor sheaths 12 6 mm 1 3 Packaging Tanks are packed in foil and su...

Страница 4: ...ght with insulation 36 kg Materials Tank material steel Tank insulation material PUR foam Outer surface of the insulation sheet metal Dimensions pos description connections Heat sources B1 Inlet from...

Страница 5: ...11 pump station for heating circuit 1 CSE2 SV cold water TV hot water CV hot water recirculation T central heating heating system KK ball valve ZV check valve AOV automatic air vent valve PTR pressure...

Страница 6: ...ermal store can be equipped with an electric heating element without a thermostatic head e g ETT A up to 7 5 kW output with a maximum length of 635 mm An electric heating elements without thermostatic...

Страница 7: ...disposed of in compliance with the valid rules When the product reaches the end of its life it shall not be disposed of as household waste It shall be dropped off at a Local Waste Recycling Centre In...

Страница 8: ...2022 We reserve the right to errors changes and improvements without prior notice REGULUS spol s r o E mail sales regulus eu Web www regulus eu v1 0 01 2022...

Отзывы: