6 - Installation and Commissioning

 
Installation shall meet valid rules and may be done by quali

fi

ed staff only. El. heating elements shall be wired by quali

fi

ed 

staff only. 
Defects caused by improper installation, use or handling are not covered by warranty. 
After the tank is installed and connected to an existing heating system, it is recommended to clean the entire heating 
system using a suitable cleaning agent, e.g. MR-501/R.
Anti-corrosion protective liquid should be also used, e.g. MR-501/F.
 

6.1 - Commissioning

The tank shall be 

fi

lled up together with the heating system, respecting valid standards and rules. In order to minimize 

corrosion, special additives for heating systems should be used. The quality of heating water depends on the quality of 

fi

lling 

water at commissioning, on the top-up water and on the frequency of topping up. This has a strong in

fl

uence on the lifetime 

of heating systems. Poor quality of heating water may cause problems like corrosion or incrustation, esp. on heat transfer 
surfaces.
 
Fill the heating circuits with the appropriate 

fl

uids and air-bleed the entire system. Check all connections for leaks 

and verify the system pressure. Set the heating controller in compliance with the documentation and manufacturer’s 
recommendations. Check regularly proper function of all control and adjusting elements.

7 - Maintenance

If the tank is 

fi

tted with a heating element, disconnect it from the mains 

fi

rst. Clean the exterior of the tank with a soft 

cloth and a mild detergent. Never use abrasive cleaners or solvents.
Check all connections for leaks.

8 - Disposal

Packaging shall be disposed of in compliance with the valid rules. When the product reaches the end of its life, it shall 
not be disposed of as household waste. It shall be dropped off at a Local Waste Recycling Center. Insulation shall be 
recycled as plastic and the steel vessel as scrap iron.

9 - Warranty

This product is covered by warranty under the conditions listed in this Manual and in compliance with the Warranty 
Certi

fi

cate. A Warranty Certi

fi

cate is an integral part of this Thermal Store scope of supply.

Содержание LYRA 1000 DVS

Страница 1: ...1 www regulus eu LYRA 1000 DVS LYRA 1000 DVS EN Installation and Operation Manual LYRA 1000 DVSTHERMAL STORE...

Страница 2: ...1000 DVS 4 4 Operation 4 5 Connection 5 5 1 Mounting pump stations and accessories onto 5 5 2 Connecting heating circuits 31 5 3 Connecting a DHW circuit 31 5 4 Connecting a solar circuit 31 5 5 Examp...

Страница 3: ...rmal insulation Thermal insulation is included in the supply It consists of 3 layers the first one is soft insulation fitting tightly on the tank the second main layer features thermal conductivity 0...

Страница 4: ...In the thermal store heating water is heated up from several heat sources like various types of hot water boilers renewable energy sources heat pumps solar collectors or electric heating elements code...

Страница 5: ...1 pcs 12223 Front Insulation for 2 Circuit Pump Station Cover 1 pcs 12720 Top Insulation for 2 Circuit Pump Station Cover 1000 l 1 pcs 12713 Black Knurled Screw M6x1 10 PA 6 6 4 pcs 13263 1 M Ball Val...

Страница 6: ...wall 1 pcs 7701 Reducing Hex Nipple 1 x 1 2 M F brass 1 pcs 11713 1 2 drain valve no handle with cap 1 pcs 13451 SOLAR PUMP STATION CONNECTION KIT Code Item name Qty 7223 SOLAR PUMP STATION CONNECTIO...

Страница 7: ...cs 13267 Connection Assy zone valve to DV 1 pcs 13268 Zone Valve Assy for DV outlet 1 pcs 13269 Solar Pool and DV Inlet Assy 1 pcs 13270 1 M Ball Valve Assy for upper return 1 pcs 13272 Pool Zone Valv...

Страница 8: ...skets included in separate kits 1 Remove the tank from its pallet and place it to its approximate position shift the bottom insulation under the tank 2 Slide the insulation inserts into the openings f...

Страница 9: ...o the sequence of installation steps described below 4 Peel off the protective foil from the insulation apply the self adhesive annuluses around the openings for connections Some annuluses are cut out...

Страница 10: ...10 6 Fit the Pressure Gauge Assy code 12689 7 Fit the plug code 7691 into the 1 sleeve below the Pressure Gauge Assy...

Страница 11: ...hex nipple code 6970 into the sleeve and the ball valve code 998 included in Kit 13234 onto the nipple Turn the ball valve into a position shown in the Fig 9 Fit the Ball Valve Elbow Assy code 13236 i...

Страница 12: ...oosen the clamps Fit the Pump Station with 4 way mixing valves code 12224 or 12225 Join it with the earlier fitted Angled Ball Valve Assy using a 5 4 union nut see Point 5 Tighten the clamps 11 Fit th...

Страница 13: ...ater Station 14 Stretch the pipes to their preliminary lengths cut the insulation and slide it onto the pipes included in Kit 12226 1 pipe 1 to 410 mm code 11271 insulation circa 500 mm long 1 pipe 1...

Страница 14: ...ter Assy with the inner elbow of the pump station with 4 way valves 16 Fit the 1 pipe 410 mm long code 11271 to the pump station 17 Fit the pipes 320 and 450 mm long code 3014 to the T Piece Assy code...

Страница 15: ...15 18 Connect the T Piece Assy at 3 points see Fig 19 Using the 5 4 pipe 580 mm long code 13984 connect the T Piece Assy with the Ball Valve Assy...

Страница 16: ...100 mm long 1 pipe 3 4 to 500 mm code 3041 insulation circa 600 mm long 1 pipe 1 DN20 360 mm code 13449 insulation circa 450 mm long 1 pipe 1 DN20 330 mm code 13450 insulation circa 400 mm long 1 pipe...

Страница 17: ...ng piece code 7223 included in Kit 13451 or 13951 onto the solar pump station code 14866 below the pump Model for a pool Fit the Pool Inlet Assy code 13269 as shown in the figure Model with no pool Fi...

Страница 18: ...18 24 Fit the solar pump station code 14866 using 2 M6x16 bolts with washers codes 12996 and 7853 included in Kit 13451 or 13951 25 Fit the Ball Valve Assy for tanks with a plate HE code 13263...

Страница 19: ...first and then the safety valve code 605 included in Kit 13237 26 Fit the plate heat exchanger support code 13438 included in Kit 13452 using 2 bolts M8x18 with washers codes 7259 and 7008 put washer...

Страница 20: ...20 28 Fit the Ball Valve Assy for lower return code 13265 29 Fit the Zone Valve Assy for DV outlet code 13268...

Страница 21: ...31 Model for a pool Remove the last part of the radiator fitting from the Zone Valve Assy code 13272 and screw it to the plate heat exchanger as shown below Model with no pool Screw the fitting code...

Страница 22: ...22 33 Fit the Assy for circulation pump connection code 13266 to the plate heat exchanger 32 Fit the 3 4 FF elbow code 10192 included in Kit 13452 to the plate heat exchanger...

Страница 23: ...o models with pool only Fit the rest of the Pool Zone Valve Assy code 13272 35 Model for a pool Using the 1 pipe 1000 mm long code 13952 connect the solar pump station reducing piece with the AB port...

Страница 24: ...long code 3041 connect the plate heat exchanger elbow with the solar pump station see fig Model with no pool Using the 1 pipe 1250 mm long code 13447 connect the solar pump station reducing piece with...

Страница 25: ...long code 3012 connect the plate heat exchanger to the Assy for connecting a zone valve 38 Fit the pump code 12128 to the Assy for connecting a circulation pump The flow direction is into the heat ex...

Страница 26: ...26 39 Fit the Zone Valve Assy code 13264 to the pump The port B of the zone valve shall be oriented upwards 40 Using the 1 pipe 460 mm long code 13448 connect the zone valve with the ball valve...

Страница 27: ...sing the 1 pipe 360 mm long code 13449 connect the zone valve with the ball valve 42 Using the 1 pipe 330 mm long code 13450 connect the zone valve with the ball valve Fit the actuators onto the zone...

Страница 28: ...he pump station with 4 way valves codes 12223 and 12720 44 Connect the terminals of the pumps push the cables behind the insulation 45 Fit the plastic cover onto the pump station with 4 way valves and...

Страница 29: ...29 46 Put the top insulation and plastic cover onto the tank 47 Fit the automatic air release valve code 11708 with the ball valve code 11965 and fitting code 6971 all included in Kit code 13237...

Страница 30: ...30 Completely fitted tank...

Страница 31: ...urn line from Heating Circuit 1 G1 F 2 Flow to Heating Circuit 1 G1 F 3 Flow to Heating Circuit 2 G1 F 4 Return line from Heating Circuit 2 G1 F 1 Domestic hot water outlet G3 4 M 2 DHW recirculation...

Страница 32: ...opposite the heating pump station EXAMPLE I Fireplace insert with hydronic heat exchanger and a hydronic heating boiler electric gas oil or pellet fired Expansion Vessel Connection Kit code 13437 fir...

Страница 33: ...located in the middle of the tank below the heating pump station are intended for these elements The G1 2 sleeve below the upper thermometer is designed to receive a safety thermostat All el heating e...

Страница 34: ...lems like corrosion or incrustation esp on heat transfer surfaces Fill the heating circuits with the appropriate fluids and air bleed the entire system Check all connections for leaks and verify the s...

Страница 35: ...35...

Страница 36: ...2017 We reserve the right to errors changes and improvements without prior notice REGULUS spol s r o E mail sales regulus eu Web www regulus eu v1 2 12 2017...

Отзывы: