background image

Level is going down  

Level 3

« N3 »

Level is rising

Filtration force 

Stop filling

Filtration

Autorisation

Level is going down

filtration force 

Autorization 

of filtration

Stop drain

Filling

Level 1
« N1 »

Level 2
« N2 »

security

level

Filling

Stop filtration

Schematic dia gram 

Emptying

Emptying

Tempo

rain

4 - Calibration of thresholds

Security filling

of 30mn until 3h

 12

Emptying

Stop fillinf 

below 5 cm

Содержание Bulleur

Страница 1: ...DESIGNED AND MANUFACTURED IN FRANCE SINCE 1989 16012019 INSTRUCTIONS INSTALLING Peace of mind Bulleur Water level regulation for overflow pools Bulleur ...

Страница 2: ...o d u c t s o f s a l t electrolyse pH regulation and regulation of water level Warranty You have just purchased a Regul Electronique we thank you for your confidence Unless otherwise specified the warranty period for our products is 3 years from the date of your invoice Excluded from the warranty are any so called wear parts fuses batteries seals air tube valves pump membranes etc This guarantee ...

Страница 3: ...ng to measure a heigh of water of 2 50 m A measuring rod made up of 3 PVC tubes 20 mm in diameter and 42 cm in length If necessary the measuring rod can be extended by a PVC tube with a diameter of 20mm An intermittent 240 V membrane compressor An electronic board protected by a 200 mA fuse A 315 mA fuse protection of the solenoid control transformer A led flashes to indicate that it is faulty pre...

Страница 4: ...4 ...

Страница 5: ...raulic installation 10 3 Configuration Menu Configuration 11 4 Calibration of thresholds Schematic diagram 12 Functionality of each threshold 13 Calibration of levels 14 6 Additional displays Additional displays 15 The Configuration menu is used to select the active functions of the Bulleur Le Calibration menu makes it possible to choose the water levels for each threshold Normal displays and indi...

Страница 6: ...ions 1 x cap for measuring rod 2 x sleeves of 20 mm to stick 3 x tubes of measuring rods PVC of 20 mm to stick length 420 mm 2 x PVC clips and 2x stainless steel screws fixation of the measuring rod in the buffer tank 25 m bubble tube 4 6 mm 1 x RAINBIRD DV 100 solenoid valve 4 x screws and fixing pins of the control box ...

Страница 7: ...d Operating controls button clic clic 2 A 2 sec click to modify a data item A short click to validate click A click to enter the configuration menu p11 to decrease or increase a value The control knob allows by pressing to change the displayed value to enter certain menus and by rotating to modify a stored value Off On to validate a function N1 à x cm to choose a value Solenoid valve Power supply ...

Страница 8: ...nting template to facilitate the installation 4 fixing holes make it possible to assemble the assembly Mark the location of the holes using a level 6 mm holes for the provided pegs 1 Installating the device 2x stainless screws 4x35mm Accessories required for wall mounting are supplied 2x anchors diam 6mm Whenever possible use the materials provided they have been chosen for their qualities stainle...

Страница 9: ...ontact Disconnect the wire connected to the filter clock contact Connect one of the wires to this contact and then the other by a quick connection on the left wire In contrast to the filtration force for safety reasons it is necessary to be able to stop the filtration in particular when the level is too low M horloge Horloge de Filtration M horloge Horloge de Filtration Connecting the electro valv...

Страница 10: ...ull Slight bias cut The tube must descend to the bottom of the cane Connect the 4 x 6 mm tube between the box and measuring rod The tube must go down inside the tube to the bottom of the rod The gland only serves to hold the tube in the measuring rod This is the place where the bubbles come out as the measurement is made ...

Страница 11: ...ify a data a single click to validate then appears on the screen Security filling to exit the menu switch off the device factory setting 1h Security filling N2 STOP Configuration from off to 3hours 30 min steps security after reaching N3 stopping the filtering force at the end of the set tempo filtration is restarted for 15 min every 60 min flashes Return Warning OFF makes it possible not to take ...

Страница 12: ...sation Level is going down filtration force Autorization of filtration Stop drain Filling Level 1 N1 Level 2 N2 security level Filling Stop filtration Schematic diagram Emptying Emptying Tempo rain 4 Calibration of thresholds Security filling of 30mn until 3h 12 Emptying Stop fillinf below 5 cm ...

Страница 13: ... in auto mode of filtration after the rain tempo Level N3 Level filtration force as the level rises above if the tempo rain is chosen in configuration menu the force filtration stops at the end of it it is restarted for 15 min every 60 min to avoid a reset in manual way by emptying backwashing etc Level emptying appears only if the function is selected in the configuration menu Controls a drain pu...

Страница 14: ...eshold stop filling stop drain N1 x cm N1 S Calibration flashes clic 2 N2 stop filling Set the desired level it is adjustable from the previous level to the chosen level Calibration Calibration Calibration clic Level N3 Threshold force filtration N2 x cm N1 S Calibration flashes clic 2 N3 force filtration Set the desired level it is adjustable from the previous level to the chosen level clic Level...

Страница 15: ...ntil it disappears TEMPO RAIN TEMPO PLUIE setting from OFF to 3h see page 12 The level N3 can be reached during a heavy rain the filtration is then forced down again below N3 little chance in case of heavy rain the time delay then makes it possible to stop the filtration force at the end of it in order to return to self filtration mode and to prevent the filtration pump from continuously operating...

Страница 16: ......

Отзывы: