22
|
E33-10 FPI Direct Vent Gas Insert
|
22
installation
CONVERSION KIT 342-969 FROM NG TO LP
for E33-10 using SIT 829 NOVA Gas Valve
THIS CONVERSION MUST BE DONE BY A QUALIFIED GAS FITTER
IF IN DOUBT DO NOT DO THIS CONVERSION !!
919-453
10.28.14
1
Each Kit contains one LP Conversion
Kit Contains:
Qty. Part #
Description
1
904-529
5/32" Allen Key
1
904-641
Burner Orifice #50
1
918-590
Label "Converted to
LPG"
1
908-528
Red LPG Label
1
910-037
LP Injector
(Pilot Orifice)
1
910-582
Stepper Motor
1
919-453
Instruction Sheet
1.
Shut off the gas supply.
2.
Remove safety screen and glass door.
3.
Remove the logs and grate (refer Log
Installation section in E33 Manual).
Ensure you slide the bottom log
03-17
off
to the right-hand side to avoid chipping.
4.
Remove burner by unscrewing the 2
screws.
5.
Pull off the pilot cap to expose the pilot
orifice.
6.
Unscrew the pilot orifice with the 5/32"
allen key and replace with the LPG pilot
orifice provided in the kit, then reinstall
the pilot cap.
Burner Orifice Removal
7.
Remove burner orifice with a 1/2" wrench,
while using a 9/16" wrench to hold onto
the elbow behind the orifice and discard
orifice.
8.
Reinstall new burner orifice LP stamped
#50 and tighten.
9.
Remove NG stepper motor by removing 3
screws in locations shown below–replace
with LP stepper motor, secure in place
with 3 screws.
E33-10
Conversion from NG to LP
for E33-10 using SIT 829 NOVA Gas Valve
THIS CONVERSION MUST BE DONE BY A QUALIFIED GAS FITTER
IF IN DOUBT DO NOT DO THIS CONVERSION !!
Installation of LP
Conversion Kit:
Installer Notice:
These instructions must be left
with the appliance.
WARNING!
Also check that the pilot and main burner injec
-
tors are appropriate for the gas type.
10.
Check for gas leaks with a proper soapy
solution or leak detector.
11.
Check for proper spark between the
ignitor and pilot cap. Refer to "Lighting
Procedure" section of the manual for light
-
ing sequence.
12.
Check pilot flames. Correct flame pattern
has 3 strong blue flames. Adjustment can
be made by turning the slotted screw at
the top right corner of the valve. Refer to
"Maintenance Instructions" section of the
manual for correct flame patterns.
13.
Check inlet (11" WC min) and outlet (10"
WC) pressures. Refer to "Gas Pipe Pres
-
sure Testing" section of the manual.
14.
Reverse Steps 5 to 3.
15.
Attach the label "This unit has been con
-
verted to LP" near or on top of the serial #
decal.
16.
Replace yellow "NG" label with red "LP"
label.
17.
Check operation of flame control.
18.
Check for proper flame appearance and
glow on logs.
Remove NG Stepper motor and
replace with LP Stepper motor
Содержание Energy E33-LP10
Страница 6: ...6 E33 10 FPI Direct Vent Gas Insert 6 dimensions UNIT DIMENSIONS OVERSIZE BACKINGPLATE WITH SPACER ...
Страница 41: ...E33 10 FPI Direct Vent Gas Insert 41 41 notes ...
Страница 46: ......
Страница 47: ......