4
G51 Zero Clearance Kit
PARTS
Included with Kit:
1
Main Body Assembly
1
Faceplate Top Insulation
1
Zero Clearance Top Louver Assembly
INSTALLATION
GENERAL INFORMATION
This kit consists of factory built parts that require minimal
assembly to form the Zero Clearance box for the G51 Gas
Insert. The Zero Clearance box can then be fixed into a framed
combustible construction, and a standard "B-vent" installed
on the assembly for the required venting. The insert can be
installed later. The faceplate will normally overlap on top of the
finished wall. You can convert the G51 Gas Insert models into
highly efficient heat producing Zero Clearance Fireplaces.
CLEARANCES TO COMBUSTIBLES
The clearances for the Zero Clearance Kit are 0" to combustibles (back, side and floor) but when planning your
installation review the clearances required (see below) after it is installed in the Zero Clearance Kit.
Clearances to Combustibles
Refer to installation manual for clearances.
Note: Ensure the paint that is used on the mantel and the facing is "heat resistant" or the paint may discolour.
The Zero Clearance Kit must be installed on a flat, solid, continuous surface (e.g. wood, metal, concrete). This may
be the floor, or raised up on a platform to enhance its visual impact.
Combustible Mantel Clearances
Refer to installation instructions on page 7 of the manual
for clearances.
Facing Requirements
The fireplace requires a non-combustible material extending
to the framing header and sides.
Содержание 390-900
Страница 10: ...PrintedinCanada ...