INSTALLATION
Drywall
12" Mantel
7 1/2" Mantel
3 1/2"
Mantel
Mantel Clearances with
Flush Glass / Full Screen Doors
14"
7"
10"
30-1/2"
to floor
2
0
12
6
4
8
10
2
0
12
6
16
4
14
8
10
Side View
Top of
Unit
6"
Standof
f
Because of the extreme heat this fi replace emits, the mantel clearances are critical.
Combustible mantel clearances from top of unit are shown in Diagram 1.
Note: A non-combustible mantel may be installed at a lower height if the framing is made of metal studs covered with a non-combustible board.
REGENCY
®
COMBUSTIBLE MANTEL CLEARANCES
These drawings are to scale at 1:6 (one inch = 6 inches)
Mantel can be installed anywhere in shaded area or higher using the above scale.
Note: Ensure the paint that is used on the mantel and the facing is "heat resistant" or the paint may discolour.