12
HZ42E Regency Horizon™ Gas Fireplace
INSTALLATION
NAILING STRIPS
The nailing strips come attached to the unit. There is 1 plate on each side,
1 on the top, and one on the bottom that can be folded out as required.
The top and side nailing strips are secured to the framing. The bottom
nailing strip is secured to the unfi nished fl oor - if installing the unit directly
on the fl oor.
UNIT ASSEMBLY
PRIOR TO
INSTALLATION
The Nailing Strips and the 2 Standoffs must be correctly positioned and attached
before unit is slid into position.
STANDOFF ASSEMBLY
The standoffs are shipped in a fl at position and must be folded into shape and
attached.
1)
Remove the standoffs from the fi replace.
2)
Take each standoff and bend into the correct shape. Bend up at the bend lines
until the screw holes in the standoff and the pre-punched screw holes on the
fi replace top line up.
3)
Attach the standoff securely to the unit with 2 screws per standoff (on opposite
corners).
IMPORTANT NOTE
Framing depth measurement is noted with the
nailing strips set as far forward on the fi rebox
as possible. The nailing strips can be adjusted
back up to 1” to allow for varying thicknesses
in non-combustible material & wall fi nishes.
Nailing Strips
Standoff
Nailing Strips shown folded out.
Содержание Horizon HZ42E-LP
Страница 57: ...HZ42E Regency Horizon Gas Fireplace 57 NOTES ...
Страница 58: ...58 HZ42E Regency Horizon Gas Fireplace NOTES ...