
10
4.5 SCHEDULE SET MODE
The VGreen Evo™ motor is equipped with two sets of energy efficient
operating schedules: Schedule Set A and Schedule Set B. Schedule Set B is
California Energy Commission 2021 Compliant.
The 8 pre-programmed operating schedules for the Schedule Set A can be
seen in the table below.
To select this set of schedules the dip switch positions must be set to, #3 OFF,
#4 OFF.
SCHEDULE SET A
SCHEDULE
PRIME
(WHEN MOTOR STARTS
FROM A STOPPED
POSITION)
24 HOURS
TIME
HOURS
0-2
HOURS
2-4
HOURS
4-6
HOURS
6-8
HOURS
8-10
HOURS
10-12
HOURS
12-18
HOURS
18-24
Schedule 1
(Factory Default)
3 minute prime
@ 3450 RPM
3450 RPM
2750 RPM
1750 RPM
1150 RPM
0 RPM
Schedule 2
3 minute prime
@ 3450 RPM
3450 RPM
2850 RPM
1850 RPM
1250 RPM
0 RPM
Schedule 3
3 minute prime
@ 3450 RPM
3450 RPM
1750
RPM
1150 RPM
0 RPM
Schedule 4
3 minute prime
@ 3450 RPM
3250 RPM
1150
RPM
3250 RPM
0 RPM
Schedule 5
3 minute prime
@ 3450 RPM
1725
RPM
Schedule 6
None
WATER FEATURE ONLY (1100 RPM)
FOR USE WITH CONNECTED POOL PUMP TIMER
Schedule 7
None
WATER FEATURE ONLY (1725 RPM)
FOR USE WITH CONNECTED POOL PUMP TIMER
Schedule 8
None
WATER FEATURE ONLY (3450 RPM)
FOR USE WITH CONNECTED POOL PUMP TIMER
Содержание Century EVQ165
Страница 1: ...INSTALLATION MANUAL AND USER GUIDE VGREEN EVO VARIABLE SPEED MOTOR...
Страница 18: ...18 INSTALLATION NOTES PAGE...
Страница 19: ......