8
RESERVOIR ASSEMBLY — ARS 2000
- 7 gallon (26.5 liter)
1) Place the reservoir on the floor, open side down.
2) Install a plastic foot on the bottom of each leg. Turn the reservoir over so
that it sits open side up.
3) Decide if you wish to mount the sight gauge faucet on either the wide
or the narrow face of the reservoir. Install the sight gauge faucet by
placing one rubber washer onto the threaded end of the faucet and
inserting the faucet through the mounting hole in the reservoir. From
inside the reservoir securely tighten in place using the black plastic jam
nut. Do not over-tighten jam nuts. Avoid squeezing out rubber washer.
Inspect to make sure that the sight gauge is straight. Position the sight
gauge retaining ring over the sight gauge and hook it over the edge of
the reservoir.
4) Install the reservoir plug by putting a rubber washer over the threaded
end of the plug and inserting it into the remaining hole in the reservoir.
From inside the reservoir, tighten into place using a black plastic jam nut.
5) Install the prepared post carbon filter cup by following the instructions
provided on page 11.
Note:
If installing an AP2000 W3000 Series Pump Box, please refer to the
Pump Box Use and Care Guide (included with your Pump Box) in order to
complete the assembly of the reservoir. The demand Pump Box is an optional
addition to your system.
Sight Gauge Retaining Ring
Black Plastic Jam Nut
Rubber Washer
Rubber Washer
Reservoir Plug
Black Plastic Feet
Sight Gauge Faucet
Mounting Hole