2.  Installation and dismantling of actuator 

 
Note: Check again whether the EA is place in accordance with the Chapter “Operation Conditions”. If 
the installation conditions are different than recommended it is needed to consult the situation with the 
producer. 

Before starting of mounting the EA onto the valve: 

  Check again whether the EA was not damaged during storing. 

  Check whether the adjusted operating stroke and connecting dimensions of the actuator (see the 

nameplate) are in compliance with the valve parameters. 

  In case of inconsonance, perform adjusting according to the part Adjusting of actuator. 

 

2.1  Installation 

 

EA  is  by  the  producer  adjusted  to  parameters  according  to  the  nameplate,  with  connecting 

dimensions according to the corresponding dimensional drawing and put it to a half-position. 

 

 

2.1.1  Mechanic connection of electric actuator to the armature 

 

STR  0PA  electric  actuators  can  be  assembled  and  operated  in  any  position.  In  horizontal 

position an actuator with two columns should be placed with columns above each other

 

 

During assembly must be take care for the space for disassembly of upper cover and  with the 

option to set up elements. 
 

Mechanic connection with connecting dimensions in accordance with 
standard DIN – Fig.2 

Connecting procedure: 

  Check  the  labels,  whether  the  travel  of  electric  actuator  and  travel  of 

armature are corresponding. 

  Set the armature (B) and electric actuator  into position „closed“. 

  Put electric actuator (A) on the armature (B). 

  Screw the actuator shaft (8) into the valve coupling (15) until the actuator 

flange  seats on the valve body  (13). 

  Tighten  the  screws  (9)  to  connect  the  actuator  flange  (5)  with  the  valve 

body (13). 

  Check connection dimensions in accordance with Fig. 

  Turn the valve output shaft  by one revolution and lock it with the nut (12). 

 
A ...........  electric actuator 
1  ...........  disengagement button  
2  ...........  hand wheel 
5  ...........  actuator flange 
6  ...........  pillar 
8  ...........  actuator output shaft 
9  ...........  screw 
 
B ...........  valve 
10  .........  valve output shaft 
12  .........  locking nut 

 

13 ...........valve body 
15 ...........valve coupling                                 

Содержание Rematic

Страница 1: ...74 1050 02 INSTALLATION SERVICE AND MAINTENANCE INSTRUCTIONS Electric linear actuators Rematic with the DMS 3 electronic control STR 0PA...

Страница 2: ...ff thrust N Wiring diagram Operating speed mm min Set stroke mm Input operation signal Warranty period months Output signal Serial number of electric motor Serial number of control unit Tests made by...

Страница 3: ...3 1 EA control set up options regulating 19 3 2 Procedure for setting individual parameters and the register of errors and warnings 21 3 3 Putting an EA into operation when the EA is set up and conne...

Страница 4: ...e EA as a lifting mechanism 1 2 Safety instructions EA of STR 0PA types are reserved technical devices with higher rate of danger with possibility of installation in areas specially danger regarding c...

Страница 5: ...e electric linear actuator Switching off thrust Manual control 0096 ISO 7000 Protection terminal 5019 IEC 60417 1 5 Guaranty Conditions The supplier is responsible for completeness of the delivery and...

Страница 6: ...ction against direct exposure of climate influence e g direct sun shine Electric actuators must be placed with access to the manual control wheel 2 Fig 2 to the cover of control box to control box to...

Страница 7: ...ium impacts shakings and vibrations AG 2 growing of plants and moulds AK 2 with strong danger of presence of animals insects birds small animals AL 2 with harmful effects of radiation of escaping stra...

Страница 8: ...3 electronic circuit board may include an electronic position switch EPV without power supply passive with output signal 4 through 20 mA Space heater 6 is placed at the control board In case of power...

Страница 9: ...STR 0PA 7 Fig 1 6 2 1 4 3 5...

Страница 10: ...0 AC 2 75 375 0 04 for 220 230 240 V AC 0 38 for 24 V AC 0 08 for 110 120 V AC 0 27 500 for 220 230 240 V AC 25 63 for 24 V AC 1 5 500 for 110 120 V AC Is valid according to specific mechanical connec...

Страница 11: ...hanged with buttons on the control unit or through a PC with the program READY relay programme selections option error indication error or warning error or not remote error or warning or not remote RE...

Страница 12: ...terminals to OPEN or CLOSE Factory s setup is described in the chapter Adjusting of actuator Programmable FAILURE REACTION OPEN CLOSE STOP SAFE POSITION Factory s setup is described in the chapter Adj...

Страница 13: ...6 to 10 5 mm Protection terminals During start up during installation of device outside and inside ground terminal must be connected for safe operation of the actuator The position of the outside and...

Страница 14: ...dry well ventilated covered spaces protected against impurities dust soil humidity by placement to racks or on palettes chemicals and foreign interventions There shall be no corrosive gases present in...

Страница 15: ...by placement to racks or on palettes chemicals and foreign interventions at ambient temperature from 10 C up to 50 C and at relative air humidity max 80 It is not acceptable to store EA outdoors or i...

Страница 16: ...ric actuators can be assembled and operated in any position In horizontal position an actuator with two columns should be placed with columns above each other During assembly must be take care for the...

Страница 17: ...ge Fig 4 Connecting procedure Check the labels whether the travel of electric actuator and travel of armature are corresponding Set the armature B into position closed and set electric actuator A into...

Страница 18: ...utton 2 hand wheel 3 coupling nut 5 actuator flange 6 pillar B valve 10 valve shaft 11 connecting nut 12 locking nut 13 valve flange 2 1 2 Electric connection and checking of function Follow up with c...

Страница 19: ...ealised with position or thrust 2 2 Dismantling Before dismounting it is required to disconnect the EA from power supply Do not connect and disconnect live connectors Disconnect the EA from mains phas...

Страница 20: ...en or torque close torque open or position open torque close or position close open close movement movement flasher to position from position warning remote control local control not valid for this ty...

Страница 21: ...ed 2P PULSE CONTROL Setting up 2P control STOP function on I1 The EA moves either to the OPEN direction or closes with 24V DC voltage pulse supplied on connectors OPEN or CLOSE The pulse may not be sh...

Страница 22: ...to move either to the OPEN or CLOSE direction with 24V DC voltage supplied to terminals OPEN or CLOSE The EA stops if power supply is cut off or the end position is reached The EA stops to respond to...

Страница 23: ...r double seat valves 3 TORQUE BLOCKING 2 sec blocking time 5 blocking position for OPEN CLOSE direction 4 READY RELAY errors READY COM NO relay contacts closed in error free conditions 5 RELAY 1 5 pos...

Страница 24: ...st be performed to ensure correct operation under actual pipeline conditions The procedure is as follows fit the given assembly into the specified technology complex connect the EA on the supply volta...

Страница 25: ...arate annex No 74 1053 02 release the adjustment pushbutton P upon release of the P pushbutton the calibration process is started turn on the control signals EA is ready for operation and responds to...

Страница 26: ...The stuff has to perform prescribed maintenance to prevent the EA during operation against impacts of environment which exceed the frame of allowed influences Manual control If needed during adjustin...

Страница 27: ...ning of all connecting and grounded screws have to be checked to avoid overheating After 6 months from putting of EA into operation and once a year it is recommended to check tightening of fixing scre...

Страница 28: ...ror and it will not operate until the error is removed With the warning flag the EA continues in operation The user is advised on error or warning through the READY relay according to the relay settin...

Страница 29: ...ons trained in the production plant or by a contracted service centre 5 Accessories and spare parts 5 1 Accessories The EA is delivered with the service handle and communication cable DB 9F RJ45 5 2 S...

Страница 30: ...28 STR 0PA 6 Enclosures 6 1 Wiring diagrams...

Страница 31: ...220 V AC eventually 24 V AC supply voltage is to be fed to the N L terminals of the voltage supply source terminal board X according to the chosen variant of the electric actuator PE ground wire does...

Страница 32: ...30 STR 0PA 6 2 Dimensional drawings...

Страница 33: ...STR 0PA 31...

Страница 34: ...32 STR 0PA...

Страница 35: ...STR 0PA 33...

Страница 36: ...34 STR 0PA...

Страница 37: ...STR 0PA 35...

Страница 38: ...36 STR 0PA...

Страница 39: ...STR 0PA 37...

Страница 40: ...38 STR 0PA...

Страница 41: ...STR 0PA 39...

Страница 42: ...40 STR 0PA...

Страница 43: ...STR 0PA 41...

Страница 44: ...k report Service center D Date of repair Guarantee repair no User of actuator Claim applied by Actuator type number Actuator production number Product claim fault Detected product fault Used spare par...

Страница 45: ...arantee service check report Service center Date of repair User of actuator Actuator operating place Actuator type number Actuator production number Detected product fault Used spare parts Remarks Iss...

Страница 46: ...0 01 Pre ov Tel 421 0 51 7480 460 Fax 421 0 51 7732 096 E mail regada regada sk Czech republic REGADA esk s r o Ltd exclusive representation REGADA s r o Ltd for sale of electric actuators Regada esk...

Отзывы: