background image

© 2014, 2015 Cequent  Performance  Products

56007N

3-27-15

Rev. D

Do not install mounting rails over plastic bed liners.  Plastic bed liners must be cut out of the way to provide 

metal to metal contact.  Mounting rails may be installed on spray in liners.

Use only bolts, nuts, and washers supplied to install this kit.  All bolts are Grade 8 unless otherwise specified.

These instructions are guidelines only, actual installation is the responsibility of the installer and the owner.  

Always measure truck and trailer before installing hitch to be sure that there is clearance at the cab and at the 

bumper to allow for turns.

Do not install this product on or attempt to tow with a truck with a 5-1/2’ bed unless a sidewinder pinbox coupler 

has been installed on the trailer.

Warning!!

When installing to Figure 3 & 6, during drilling protect the fuel tank and filler tubes, brake lines and wire harness by placing a piece of 
metal between the box floor and potential components at risk on the driver’s side. This will prevent drilling into these items. 

Installation Instructions

1.

Lower and remove spare tire. Remove exhaust heat shield from the underneath the passenger side of the vehicle.

2.

On Pickups with OE Trailer Brake Controller:

Relocate the electrical plug that is located on the inside of the driver’s side frame rail 

over the rear wheel (Figure 4a).  The plug may be removed from the frame by loosening the two bolts on the outside of the frame and 
pushing the bolt heads through the key hole slots, as shown in Figure 4b.  Attach the plug to the angle bracket supplied with the 
mounting kit.  The bracket will be attached to the inside of the frame with a 5/8” bolt at a later installation step.

3.

Place one mounting rail in the bed of the vehicle.  Center the rail on the floor of the truck bed and use your tape measure to locate the 
proper distance from the rail to the to the rear edge of the truck box as illustrated on page 7. 

4.

Use a center punch to mark the holes in the rail per the illustration.  Move the rail out of the way and drill each position with a 1/8” drill 
bit.  

Note: When drilling holes through the bed be sure what is below the truck bed in those locations.

5.

Temporarily position the frame brackets on the sides of the frame and check that the 1/8” drilled holes align with the slots in the frame 
brackets.  Remove the frame brackets from the vehicle.

6.

Enlarge the 1/8” drilled holes to 9/16”.

7.

Fasten the frame brackets to the vehicle frame rails as shown in Figure 3. Pass the cap head bolt (6) through the  conical washer (4) and 
then the rearward slot interior of the truck frame.  Place the mounting bracket (1), conical washer (4), and the nut (3) on and hand 
tighten.  On Pickups with OE Brake Controller, refer to installation step 2 to relocate the plug with the angle bracket.  Use the cap head 
bolt (6) to attach the angle bracket to the inside of the frame (see Figure 4c) , the angle bracket will go between the flat washer and the 
frame

8.

The forward slot of the truck frame will require using the supplied wire pull (9) to install the carriage bolt to the interior of the truck 
frame.  Pass the wound end of the wire through the exterior of the frame, pulling it enough to thread the rectangular carriage block (8) 
and the 5/8” carriage bolt (7) on to the wire pull.  Pulling the wire pull back through the frame will allow the installation of the mounting 
bracket, conical washer (4) and the nut (3).  Hand tighten the nut in place.

9.

Reposition the mounting rail over the holes in the bed and fasten the mounting rail to the frame brackets using the hardware supplied 
with the rail kit.  Use the U-shaped blocks between the frame bracket or mounting rails and the truck bed to ensure metal to metal 
contact.  Install center bolt and hand tighten.

10.

Place the unassembled 5

th

wheel support arches/slider/goose into the already installed mounting rail.  Position the truck forward 

mounting rail with the support arches/slider/goose by inserting the tabs into the mounting rail and pushing the mounting rail tight 
towards the other mounting rail.  Ensure that the mounting rail is centered on the bed of the vehicle.  This will position the rail in the 
correct location and ensure that the 5

th

wheel will have a snug fit to the truck.  

Note:

If more than one hitch product will be used with the 

mounting rails then both types should be used at the same time to align the rearward mounting rail. This will ensure that one product 
does not compromise the fit of the other.

11.

Repeat installation steps 4, 6 and 9 for the forward rail.

12.

Starting with the hardware that fasten the mounting brackets to the bed rails and torque all the nuts. Torque the 1/2” fasteners to 110ft-
lbS (149N*M), and the 5/8” bolts to 212 ft-lbs (287N*M). 

13.

Re-install spare tire.

Sheet 4 of 7

- Printed in Mexico

Содержание 56007

Страница 1: ...ecommended vehicle towing capacity READ ALL INSTRUCTIONS BEFORE STARTING THE INSTALLATION REESE Custom Quick Install mounting brackets only include the hardware to attach the custom brackets to the fr...

Страница 2: ...interior of the truck frame Place the mounting bracket 1 5 8 conical washer 4 and the 5 8 nut 3 on and hand tighten On Pickups with OE Brake Controller refer to installation step 2 to relocate the pl...

Страница 3: ...e towing vehicle manufacturers recommended vehicle towing capacity READ ALL INSTRUCTIONS BEFORE STARTING THE INSTALLATION REESE Custom Quick Install mounting brackets only include the hardware to atta...

Страница 4: ...with the slots in the frame brackets Remove the frame brackets from the vehicle 6 Enlarge the 1 8 drilled holes to 9 16 7 Fasten the frame brackets to the vehicle frame rails as shown in Figure 3 Pas...

Страница 5: ...stall mounting brackets only include the hardware to attach the custom brackets to the frame 10 BOLT INSTALLATION Equipment Required Fastener Kit 56007F Wrenches 3 4 15 16 Drill Bits 1 8 9 16 Other To...

Страница 6: ...3 on and hand tighten 7 Passing the 1 2 carriage bolts 9 through the top and middle slots in the reinforcement block 10 will create a clamping strap that will go inside the frame rail and connect to t...

Страница 7: ...contact Us at our principal address of 47912 Halyard Dr Suite 100 Plymouth MI 48170 1 888 521 0510 identify the product by model number and follow the claim instructions that will be provided Any retu...

Страница 8: ...bricant du v hicule de remorquage concern LIRE TOUTES LES INSTRUCTIONS AVANT L INSTALLATION Les supports du n cessaire de montage rapide sur mesure REESE ne comprennent que la visserie n cessaire la f...

Страница 9: ...ar l int rieur de la fente arri re du cadre du v hicule Poser le support de montage 1 la rondelle conique 5 8 po 4 et l crou 5 8 po 3 et serrer la main Sur les camionnettes quip es d une commande de f...

Страница 10: ...e d passer la capacit de remorquage indiqu e par le fabricant du v hicule de remorquage concern LIRE TOUTES LES INSTRUCTIONS AVANT L INSTALLATION Les supports du n cessaire de montage rapide sur mesur...

Страница 11: ...supports de cadre sur les c t s du cadre et v rifier que les trous perc s de 1 8 po s alignent sur les fentes des supports de cadre Retirer les supports de cadre du v hicule 6 Agrandir les trous 1 8...

Страница 12: ...N Les supports du n cessaire de montage rapide sur mesure REESE ne comprennent que la visserie n cessaire la fixation des supports sur mesure sur le cadre INSTALLATION 10 BOULONS quipement requis Viss...

Страница 13: ...e montage 1 la rondelle conique 4 et l crou 5 8 3 et serrer la main 7 L insertion de boulons de carrosserie 1 2 po 9 dans les fentes sup rieure et centrale du bloc de renforcement 10 formera une bride...

Страница 14: ...de l acheteur Pour effectuer une r clamation communiquez avec nous notre adresse principale 47912 Halyard Dr Suite 100 Plymouth MI 48170 1 888 521 0510 et veuillez identifier le produit d apr s le num...

Страница 15: ...culo de remolque LEA TODAS LAS INSTRUCCIONES ANTES DE EMPEZAR LA INSTALACI N Los soportes de montaje de instalaci n r pida a la medida REESE s lo incluyen las piezas para instalar los soportes a la m...

Страница 16: ...a trav s de la arandela c nica 4 de 5 8 y luego del interior de la ranura trasera del bastidor del veh culo Coloque el soporte de montaje 1 la arandela c nica de 5 8 4 y la tuerca de 5 8 3 y apriete a...

Страница 17: ...la capacidad de remolque del veh culo recomendada por el fabricante del veh culo de remolque LEA TODAS LAS INSTRUCCIONES ANTES DE EMPEZAR LA INSTALACI N Los soportes de montaje de instalaci n r pida a...

Страница 18: ...e que los orificios perforados de 1 8 se alineen con las ranuras en el soporte del bastidor Retire los soportes del bastidor del veh culo 6 Incremente los orificios perforados de 1 8 a 9 16 7 Sujete l...

Страница 19: ...medida REESE s lo incluyen las piezas para instalar los soportes a la medida al bastidor INSTALACI N DE 10 PERNOS Equipo necesario Kit de tornillos 56007F Llaves 3 4 15 16 Brocas de taladro 1 8 9 16...

Страница 20: ...montaje 1 la arandela c nica 4 y la tuerca de 5 8 3 y apriete a mano 7 Al pasar los pernos de carruaje de 9 a trav s de las ranuras superior y media en el bloque de refuerzo 10 se crear una correa de...

Страница 21: ...nosotros con la nica excepci n de alteraciones realizadas de acuerdo con las instrucciones del producto y de una manera profesional 3 Obligaciones del comprador Para hacer una reclamaci n de garant a...

Отзывы: