
5. Connect the water supply lines and waste outlet.
6. Replace drawer back onto the vanity unit and make any necessary adjustments.
Pull the runners all the way out
and sit the drawer on top
Push all the way in until you
hear the click on both sides
5. Fix the top to the vanity unit using quality bathroom use silicone.
The gap between the wall and top will need to be filled with silicone.
The vanity unit must then be sealed to the wall on all edges with silicone.
DRAWER ADJUSTMENT
It is the responsibility of the installer to make any adjustments to the drawer after installation
(if required)
There may have been some movement in transportation and installation which causes drawers to become unaligned.
Drawer Adjustment Front Left / Right
There is a small metal latch
under the drawer. Push it back
halfway. Full push releases the
drawer front
Using slight pressure, move
the drawer front in the desired
direction.
Repeat on both sides
Drawer Adjustment Front Up / Down
Half turn 1x screw to unlock the
height adjustment.
The larger bottom screw
adjusts the drawer /-
2mm.
Drawer Front Tilt Adjustment
Adjust tilt with a screwdriver
from underneath the front cover
cap
Half turn 1x screw to unlock
the height adjustment.
Plumbers, please ensure a copy of the installation instructions
is left with the end user for future reference
page 2 of 3
K A D O
Kado Arc Timber Vanity
K A D O
Kado Arc Timber Vanity