AN-50e
user manual
70-00033-01-03
Proprietary Redline Communications © 2005
September
2005
Page 96 of 100
6.6 Quick
Config
Guide
This procedure is an aide for configuring basic PMP operation on V3.0 AN-50 and
AN-50e systems. For detailed installation and setup procedures, refer to the
AN-
30e/AN-50e Quick Install Guide
and the
Redline BFW Installation Guidelines
user
manuals provided on CD-ROM.
Beginning with V3.0, the AN-50/AN-50e PMP systems must have logical groups
and connections configured before the system will transmit any Ethernet traffic
over the wireless interface. This procedure provides simple steps to setting up an
initial configuration for testing, and then introducing VLAN traffic controls.
Figure 35
:
Reference - Example System Configuration
The following table provides an example of the settings for a pass-though group at
the sector controller and connections to two subscriber stations.
Group Configuration (SC)
Connection Configuration (SS)
Group
Name
Port
Tagging
GROUP
VID
Connection
Name
Port
Tagging
Link
ID
Group
ID
Connection
VID
SC-1 Pass
Through
NA SS-1 Pass
Through
[L-1]* [SC-1]*
NA
SS-2
Pass
Through
[L-2]* [SC-1]*
NA
*The group ID and link ID are numbers generated by the AN-50/AN-50e
and must be read from the configuration screens.
Содержание AN-50e
Страница 28: ...AN 50e user manual 70 00033 01 03 Proprietary Redline Communications 2005 September 2005 Page 28 of 100 ...
Страница 52: ...AN 50e user manual 70 00033 01 03 Proprietary Redline Communications 2005 September 2005 Page 52 of 100 ...
Страница 99: ...AN 50e user manual 70 00033 01 03 Proprietary Redline Communications 2005 September 2005 Page 99 of 100 ...