4
/
9
Package Contents
In addition to lighting, the package is also equipped with the following items:
Accessory Optional
1: cable a.lamps
2: signal line b.rack
3: Instructions:
4: Warranty Card:
2.LAMP INSTALLATION
Loosen the beam lamp head plastic cover, open the inlet side of the fan, you can replace the lamp. When
installing the bulb, the bulb should be noted seated, otherwise easily lead to poor contact due to a short
circuit high voltage discharge, the impact of lamp life, damage to the circuit board components.
5R Cup bubble series products as high-pressure lamp bulb with external trigger, so when these lamps
operate, need to be careful. Before the operation, you should read the notes on these lamp manufacturers
to provide, by the operation of accidents caused by improper manufacturer does not assume any
responsibility.
Warning 1: lamp bulb is not installed, do not turn on the power to the computer lights, otherwise it will
burn fixtures.
Warning 2: bulb during installation, you must first disconnect the power.
Warning 3: The physical characteristics of the lamp work will reach a very high temperature, and gas
discharge bulbs can not continue to supply it, it must after every power failure, after 15 minutes to cool
completely before it can be anything. Doing so can cause high voltage discharge, short circuit, and even
burn computer control components on the board.
3.POWER SUPPLY AND SIGNAL CABLE
Main power connector
Using a dedicated plug to connecte computer lamp and power supply. It should be noted fixtures voltage
with frequency and power supply are the same signs on. Recommended that each lamp has a separate
power switch, so you can freely make each computer lights turned on or off . This fixture selection of input
voltage and frequency parameters are:
Voltage
90v/240v
Frequency
50-60Hz
Signal cable
Connecting the output of the host fixture and the terminal of the fixture between,put The host computer
DIGITAL OUT socket is connected to the vice computer IN socket. Then OUT jack is connected to the next
fixtures IN socket, and so on until all the sub scanners are connected together. As shown below: