![Redexim Verti-Drain 1513 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/redexim/verti-drain-1513/verti-drain-1513_user-manual-and-parts-book_1429084019.webp)
19
13.0 MAINTENANCE
Time line
Check point /
Lubrication point
Method
Before
every
use
Check for loose bolts / nuts.
Tighten the loose bolts/nuts
with the correct torque.
Couple the machine to a tractor
and let the machine run for 5
minutes.
Look and listen for strange
movements/noises.
Check the oil level in the gear
casings.
If necessary, use
80W90 - 0.9 LITER.
Presence and legibility of the
safety stickers.
(Fig.7)
Replace these if
absent/damaged.
Loose parts near the PTO.
Secure the parts so they do
not come close to the PTO.
After
initial
20 operating
hours
Lubricate PTO, roller bearings
Use EP 2 lubricating grease.
(new or repaired)
Check for loose bolts / nuts.
Tighten the loose bolts/nuts
with the correct torque.
Couple the machine to a tractor
and let the machine run for 5
minutes.
Look and listen for strange
movements/noises.
Check the oil level in the gear
casings; this has to reach to the
middle of the level indicator.
Use 80W90 - 0.9 LITER.
Check the gearbox for oil
leakage.
Replace seals / sealant
paste.
Loose parts near the PTO.
Secure the parts so they do
not come close to the PTO.
After
initial
50 operating
hours
(new or repaired)
Change the oil in the gear
casing.
Use 80W90 - 0.9 LITER.
After
every
50 operating
hours
Lubricate PTO, roller bearings
Use EP 2 lubricating grease.
Check for loose bolts / nuts.
Tighten the loose bolts/nuts
with the correct moment.
Couple the machine to a tractor
and let the machine run for 5
minutes.
Look and listen for strange
movements/noises.
Check the gearbox for oil
leakage.
Replace seals / sealant
paste.
After
every
500 operating
hours
Change the oil in the gear
casing.
Use 80W90 - 0.9 LITER.