Step 5: Turn ON and Shutdown procedure
Once the HoneyBadger is in place and correctly wired up, you may start the system.
To power up the unit follow the steps below:
1
Switch on the battery switch on the top of each lithium
battery. The display and LED light on each battery will
come on.
2
Switch on the BATTERY SYSTEM D.C. ISOLATOR; the
Quattro Inverter and CCGX display will start (note the
small black switch on the front of the Inverter itself
needs to be in the ON position)
3
Switch on the SOLAR D.C. ISOLATOR #1 and - if available
- #2 Isolator
4
Switch on the MPPT #1 and - if available - #2 Isolator
5
Position the Changeover switch upwards (position 1);
6
Turn ON all AC circuit breakers
Note: the shutdown procedure is shown is the reverse of the
start-up procedure. This label is affixed to the inside of the
HoneyBadger.