2 INSTALLATION
GUIDE
Solar
Panel
Load
Fuse
20A
Fuse
20A
Fuse
Start
Ba
tter
y
House
Ba
tter
y
Twisted Wires
Current shunt
Common
ground
point
Loads
Ba
tter
y
Sensor
240V AC
from mains
po
wer
Remote
Monitor
Chassis
Earth
Not
supplied
Not
supplied
Not
supplied
BMS1215S2
Typical 24V Setup
*
*
The size of this fuse r
elates to the total curr
ent dr
aw of all the loads connected
to the House Batter
y,
and should be r
ated slightly higher than this.
1
3
2
4
5
6
7
8
9
Chassis
Earth
+
-
+
+
-
-
+
-
to vehic
le
ignition
24V normally open relay
(not supplied)
Figure 2.4.3 -
Typical 24V setup.
20
Содержание BMS1215S2
Страница 1: ...Battery Management System BMS1215S2 ...