
12
Recommended Silicon – Non-acetic, neutral cure
150°C or higher temperature rated.
Bostik RTV 926 or similar.
Apply an 8mm thick silicon bead fully around heater
connection approx. 10mm from the top.
Apply an 8mm silicon bead fully around the inside of
the flue end (heater connection end)
Fit flue clamp over flue (loosely).
INSTALLATION INSTRUCTIONS
(continued)
Slide flue onto connection spigot fully.
Tighten clamp fully.
Wipe excess silicon, visually check connection to
ensure connection is fully sealed.
4. Repeat above with air intake flue pipe to heater connection.
5. Clip flues as required to provide adequate support.
6. Connection to wall mounted fan terminal
Содержание VEKTOR 1100
Страница 6: ...6 DIMENSIONS FLUE CONNECTIONS...
Страница 10: ...10 FLUE TERMINATION...
Страница 28: ...28 Campfire media clear pebbles and small ceramic coals MEDIA INSTALLATION...
Страница 46: ...46 WIRING DIAGRAM...
Страница 53: ...53...
Страница 54: ...54...
Страница 55: ...55...