![Real Flame Hot Box Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/real-flame/hot-box/hot-box_installation-and-operating-manual_1425133007.webp)
COMMISSIONING PROCEDURE
(continued)
CLEARANCES FROM COMBUSTIBLES
WARNING
Care must be taken to ensure that any return air register exhaust system does not
adversely affect the operation of the appliance or draught of chimney or flue.
“DO NOT place articles on or against this appliance.”
“DO NOT use or store flammable materials near this appliance.”
“DO NOT spray aerosols in the vicinity of this appliance while it is in operation.”
25mm
Cast iron
fascia
DIAGRAM 1.
PLAN
425mm
930mm
Floor
0 mm
Sides
25 mm
Back
25 mm
Top
100 mm
Flue Outer
25 mm
Flue can be offset
with two 45° bends,
no more than 20% of
overall height of flue.
NOTE: Install unit
and flue prior to
plastering.
NOTE: Plaster is to
finish flush with the
fascia as shown.
Plaster
Fascia
Stud
Firebox
A minimum of 3.6m
flue is required to
protrude 500mm
above roof line.
7
I
Содержание Hot Box
Страница 5: ...NATURAL GAS LPG DATA PLATE Affixed to burner Injector 2 5 1 3 Mj Hr 26 23 P T P 0 8 2 7 5...
Страница 10: ...DIMENSIONS A B C 570 455 230 10...
Страница 14: ...INNER CASING 3 6M FLUE KIT COMPLETE WITH COWL FLUE COLLAR OUTER CASING ZERO CLEARANCE HOT BOX COMPONENTS 14...
Страница 22: ...OPTIONAL POWER FLUE continued Frameout Fan Casing Pressure Differential Switch Motor Motor 22...