Watt's Up Applications
26
Connect the receiver and it’s servos on the Watt's Up LOAD side and a suitable power
source, e.g. your receiver battery or BEC on the SOURCE side. See the connection
diagrams for an example.
Fully exercise your servos, simultaneously if possible, to create the maximum load on the
battery or BEC. Monitor the peak Amps, peak Watts and minimum Volts to verify
acceptable values. Unexpected peaks may be due to stalled or defective servos or linkages,
etc. Remove power from
both
Auxiliary and SOURCE to reset the peak and minimum
values.
"Watt's Up" & "Doc Wattson" Watt Meter and Power Analyzer User's Manual
RC Electronics, Inc.