background image

- 5 - 

It must be installed into the plane body or test stand for operation. 

4.    Please don’t remove any parts of this unit by yourself. Since it has been done well balancing procedure. Otherwise it may be affected 

the performance after any removal action. 

Main Accessories 

 

 

MAIN WING SET 

WING FUEL TANK (RIGHT & LEFT) 

HEADER COVER 

 

 

EDF COVER SET

 

CANOPY SET

 

LANDING GEAR HOSUING SET

 

 

 

INTAKE SET (RIGHT&LEFT)

 

MAIN FUSELAGE

 

LOWER FRONT FUSELAGE

 

 

 

EXHAUST COVER SET

 

HORIZONTAL STABILIZER

 

VERTICAL STABILIZER

 

Remarks: 1) Operational Manual    (included) 
        2) 5 Min. epoxy set  (included) 

Содержание F9F-2

Страница 1: ...color to meet customer s choice 2 different material F9F 2 OB F9F 2 TB F9F 2 YB F9F 2 WR F9F 2 GYR F9F 2 GRW F9F 2 BRY Original Blue Tail Blue Yellow Blue White Red Gray Yellow Red Gray Red White Blu...

Страница 2: ...pes EDF set for your selection 1 EDF68 1AP is standard equipment 2 EDF68 1A is a higher grade EDF set which is an aluminum alloy material EDF more powerful output efficient and durability 3 Please be...

Страница 3: ...ower system Brushless electrical ducted fan Thrust Up to 1200g with 3s Up to 1450g with 4s Up to 1600g with 6s Function Retract landing gear system full scale flap performance optional Gear doors syst...

Страница 4: ...pplication 200 500W Static Thrust Up to 780g 7 35N 25oz Related product LEDF68 1AP39 Caution 1 EDF during working please don t overload the current high point LEDF68 1A39 40A 60s 45A 30s 50A 10s 4S 3S...

Страница 5: ...re Otherwise it may be affected the performance after any removal action Main Accessories MAIN WING SET WING FUEL TANK RIGHT LEFT HEADER COVER EDF COVER SET CANOPY SET LANDING GEAR HOSUING SET INTAKE...

Страница 6: ...One plastic bag includes screws Control Horns Linkage Stoppers Retract Landing Gear Assembling the aircraft Take out the elevator from the horizontal stabilizer Use the epoxy set to glue up the eleva...

Страница 7: ...bilizer with epoxy Then link up the rudder and glue up with epoxy Please link up both servo of rudder elevator with the extension cord first Install those into the main fuselage with epoxy Then instal...

Страница 8: ...etract landing gear battery hard wood platform Glue the lower front fuselage into main fuselage Take out the aileron from the main wing Use the epoxy set to glue up into the main wing Install the main...

Страница 9: ...the front canopy with click to lock up Hand holds the front canopy and pull up to open it for changing the battery or doing any maintenance issue The final action is installed the main wing into the m...

Страница 10: ...10 Install the EDF set and ESC system Lock up the EDF cover set Link up the elevator push rod Link up the right left aileron push rods...

Страница 11: ...straightly after it run more than 60 feet then pull the elevator joy stick and it will take off Flight To keep F9F 2 flying only need 50 of the maximum power it is a good idea to fly with power for a...

Страница 12: ...ter on the transmitter for the rudder on the suit position Can not climb The battery is not fully charged The elevator declines downward Charge the battery Adjust the micro adjuster on the transmitter...

Страница 13: ...13 3 Nose Gear door fully open position 4 Main Gear Door fully open position 5 Fully closed main gear position...

Страница 14: ...14 6 Nose gear fully closed position 7 Configuration of main Gear doors 8 Configuration of nose Gear doors...

Страница 15: ...15 Addition 2 FLAP INSTALLATION INFORMATION Cut out the flag part form the main wing and prepare a linkage rod and control hom shown as the picture...

Страница 16: ...t and put in the control hom and push rod as shown picture Check up the flag system to be able operated well or not The flag system has been completed The throws of flag is recommended to make two poi...

Страница 17: ...17 Fix up the gear PVC sheet with strong double tape or hot melt glue as shown Fix up the nose gear PVC sheet with strong double tape or hot melt glue as shown New PVC sheet intake air cover...

Страница 18: ...18 Fix up the PVC sheet intake air cover into the main body with strong double tape or hot melt glue as shown F9F 2 hand launch version is completed as shown...

Отзывы: