83
12.11 - Sidewall
termination – Concentric
vent
12.11.1 - Description and usage
The termination kit must terminate outside the
structure and must be installed as shown in
Figure 12-19.
The required concentric termination kit as well as
combustion air and vent pipe materials are listed
in Figures 12-7 and 12-8.
The termination ending must be protected from
rain, see Figure 12-20.
12.11.2 - Sidewall termination
installation
1. Determine the best location for the termination
kit (see Figures 12-19 and 12-20).
2. The total length of piping for vent or air must
not exceed the limits given in Section 12.3.
3. You must consider the surroundings when
terminating the vent and air:
a. Position the vent termination where vapors
will not damage nearby shrubs, plants or air
conditioning equipment or be objectionable.
b. The flue products will form a noticeable
plume as they condense in cold air. Avoid
areas where the plume could obstruct
window views.
c. Prevailing winds could cause freezing of
condensate and water/ice buildup where
flue products impinge on building surfaces
or plants.
d. Avoid possibility of accidental contact of flue
products with people or animals
e. Do not terminate above any door or window.
Condensate can freeze, causing ice
formations.
f. Locate or guard vent to prevent condensate
damage to exterior finishes.
4. Cut one (1) hole 5 inch diameter into the
structure to install the termination kit.
5. Install the Concentric vent kit following the
concentric kit manufacturer’s instruction.
NOTICE!
Ensure termination location clearance
dimensions are as shown in Figures 12-19 and
12-20.
CAUTION!!!
DO NOT use field-supplied
couplings to extend pipes. Airflow
restriction will occur and may cause
intermittent operation.
6. Operate the appliance one (1) heat cycle to
ensure combustion air and vent pipes are
properly connected to the concentric vent
termination connections.
12 - INSTALLATION - CATEGORY IV: Vent and combustion air
Figure 12-19 Concentric
sidewall termination clearances
Overhang or roof
Grade / snow line
Vent
Combustion air
intake
Figure 12-20 Concentric sidewall
termination clearances
Содержание Infinity Energy 2
Страница 3: ...3 SAFETY INSTRUCTIONS...
Страница 5: ...5 SAFETY INSTRUCTIONS...
Страница 62: ...62 10 INSTALLATION Electrical connections Figure 10 4 Electrical customer connection for IB boilers...
Страница 63: ...63 10 INSTALLATION Electrical connections Figure 10 5 Electrical customer connection for IW water heaters...
Страница 132: ...132 17 MAINTENANCE...
Страница 136: ...136 19 SPARE PARTS Spare parts...
Страница 139: ...139 19 SPARE PARTS 50 48 50 49 53 56 57 55 54 58 47 52 48 52 51 55 52 020010 03 006 199...
Страница 162: ...162 22 SEQUENCE OF OPERATION for BOILER...
Страница 163: ...163 23 SEQUENCE OF OPERATION for WATER HEATER...