background image

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

SYDNEY  |  MELBOURNE  |  BRISBANE  |  PERTH  |  AUCKLAND

Australia

   1300 788 778   www.rba.com.au   |

   New Zealand

   0800 722 111  www.rbagroup.co.nz

4 of 5

11. Slide flange covers down into 
place. Repeat for all fixing points. 

12. Follow Steps 1-9 to install 
Steri+Shield

TM

 seals and secure wall 

plates to rail, repeating for all fixing 
points.

15. Ensuring rail is level, slide up 
flange cover and secure screws. 
Repeat for all fixing points.

16. Slide flange covers down into 
place.

13. Slide dress rings over connector 
piece on both sides.

14. Slide both straight rails into place 
over connector piece. Please note the 
fixing on the connector piece is always 
parallel to the vertical straight rail.

10. Ensuring rail is level, slide up 
flange cover and secure screws. 
Repeat for all fixing points. 

Installing RBA490X-901 & RBA490X-911

Отзывы: