INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS
SYDNEY | MELBOURNE | BRISBANE | PERTH | AUCKLAND
Australia
1300 788 778 www.rba.com.au |
New Zealand
0800 722 111 www.rbagroup.co.nz
4 of 5
11. Slide flange covers down into
place. Repeat for all fixing points.
12. Follow Steps 1-9 to install
Steri+Shield
TM
seals and secure wall
plates to rail, repeating for all fixing
points.
15. Ensuring rail is level, slide up
flange cover and secure screws.
Repeat for all fixing points.
16. Slide flange covers down into
place.
13. Slide dress rings over connector
piece on both sides.
14. Slide both straight rails into place
over connector piece. Please note the
fixing on the connector piece is always
parallel to the vertical straight rail.
10. Ensuring rail is level, slide up
flange cover and secure screws.
Repeat for all fixing points.
Installing RBA490X-901 & RBA490X-911