background image

4

5

www.raytecled.com

www.raytecled.com

UK / Europe Tel: +44 (0) 1670 520055

Americas Tel:  +1 613 270 9990

UK / Europe Tel: +44 (0) 1670 520055
Americas Tel:  +1 613 270 9990

Typical wiring diagram

LED DRIVER #1

Ex 'd' Enclosure

Ex 'e' Junction Box

LED+

LED-

N
L

DA

DA

LED1+ LED1-

L

E

N

DA

DA

LED2+

LED2-

Ex 'em' Enclosure

Ex d

Assembly

LED DRIVER #2

LED+

LED-

N

L

DA

DA

LED2+ LED2-

LED1+
LED1-

EQUI

EQUI

1
2

3

4

5
6

7
8
9

1
2

3

4

5
6

7
8
9

L

E

N

DA

DA

LED2+

LED2-

LED1-

LED1+

3.  Open terminal block enclosure
4.  Installer should earth the unit separately – an internal and external earth point are 

provided as standard

5.  Connect wires to mains supply.
6.  If the unit is opened for any reason, disconnect mains 
7.  All  SPARTAN  floodlights/highbay  have  terminal  blocks  suitable  for  looping  4mm2 

cable, only one  cable should be connected to each terminal block connection – when 

incoming cables are installed a creepage and clearance of 5mm and 4mm respectively.

8.  To use DALI/Dimming interface, connect the DALI terminals on the terminal block
9.  Ensure no cables are trapped and gasket is seated correctly and replace terminal 

block cover. Tighten to 4Nm

10.  If carrying out Insulation Resistance tests the normal method of insulation testing 

is to connect Live and Neutral together and test between this point and Earth to 

prevent the risk of damage to the electronic control gear.

Wire the Mains cable into the terminal block. Provision has been made for this and identified 

as the E (Earth), L1 (Switched Live), L2 (permanent live) and N (Neutral) terminals. There are 

two pairs of contacts for each of these to facilitate a mains cable that can be looped in and 

out of the unit. The L2 terminals on a standard unit are not electrically connected but allows 

them to be used on the same circuits as 

emergency bulkheads.

Mounting SPARTAN Unit – Highbay Application

 422 (16.6") 

 353 (13.9") 

 536 (21.1") 

 457 (18") 

13

(0.51")

 33 (1.3") 

 172 (6.8") 

E:  Earth 
N: Neutral 
L1: Live

Содержание SPX SPARTAN

Страница 1: ...hts Overview 1 Safety Instructions 2 Installation 3 Maintenance 4 Technical Specification 5 Trouble Shooting The SPARTAN HP series of explosion protected floodlights highbay are specialist devices cer...

Страница 2: ...minimum of 5 full thread engagement and be of a medium fine tolerance to ISO965 1 and ISO965 3 The cable entry devices selected must maintain the IP rating of the luminaire 7 The incoming mains cable...

Страница 3: ...s are installed a creepage and clearance of 5mm and 4mm respectively 8 To use DALI Dimming interface connect the DALI terminals on the terminal block 9 Ensure no cables are trapped and gasket is seate...

Страница 4: ...e carrying out any maintenance work 4 The unit has 2 independent power supplies in the event that a power supply needs to be replaced remove the flameproof cover to get access to the power supply Remo...

Страница 5: ...ctly wired to terminal block Red to Red Black to Black paired cables 2 Ensure Mains input is correctly connected 3 Ensure Mains Input is turned on at the source 4 If LED panel fails to light is it pos...

Страница 6: ...e Directive 2014 30 EU EMC Directive Signed Name Barry Thompson Position Director Dated Serial number Manufacturer Raytec Ltd Unit 15 Wansbeck Business Park Rotary Parkway Ashington Northumberland NE6...

Страница 7: ...UK Europe T 44 0 01670 520055 hazsales raytecled com Americas T 1 613 270 9990 ushazsales raytecled com www raytecled com...

Отзывы: