940-M-0003  

Page 5 

Revision B 

 

 

Wire the Mains cable into the terminal block. Provision has been made for this and 
identified as the E (Earth), L (Live), Ls (Live switched) and N (Neutral) terminals. There 
are two pairs of contacts for each of these to facilitate a mains cable that can be looped 
in and out of the unit. The Ls terminals on a standard unit are not electrically connected 
but allows them to be used on the same circuits as 

*emergency floodlights.

 

 

4.

  Installer should earth the unit separately 

– an internal and external earth point are 

provided as standard 

 

5.

  Connect wires to mains supply. 

 
 

6.

  If the unit is opened for any reason, disconnect mains 

– 

*On emergency luminaires 

there may be more than one mains supply

 

 

7.

  All SPARTAN floodlights have terminal blocks suitable for looping 4mm

2

 cable, only one  

cable should be connected to each terminal block connection 

 
 

8.

 

*The battery fuse located within the Bulkhead housing on emergency variants is 

disconnected after final manufacturing testing. When installing the floodlight the battery 
fuse will need to be reconnected and the unit charged for 24 hours and then discharged 
(repeated 3 times) to bring the battery up to peak capacity.

 

 

9.

 

*If a 4 core cable is used on emergency luminaires 

– L, Ls, N and E the link cable at the 

front of the terminal block between L and Ls should be removed

 

 
 

10.

 

*During emergency operation the light output and duration will be determined by the 

variant purchased

 

 

3. MAINTENANCE 
 

1.  It is essential that all SPARTAN Bulkhead units are maintained in accordance with the 

requirements of the EN60079-17standard: (Electrical apparatus for explosive gas 
atmospheres 

– other than mines). 

 
2. 

IMPORTANT.  

No modifications are permitted to the unit, all spare parts must be 

purchased from the manufacturer, unauthorized modifications or spare parts will 
invalidate certification and make the equipment dangerous. 

 

 
3.  Isolate the SPARTAN Bulkhead from the mains supply and allow to cool before carrying 

out any maintenance work. 

 
4.  In the unlikely event of a number of LED

’s failing, the light engine assembly must be 

replaced. This is achieved by loosening front cover bolts, disconnecting the white LED 
cables to power supply, remove four M6 bolts from rear of light engine and pull the light 
engine assembly clear. Re fitting a light engine is a reversal of the above procedure. 

 

 

Содержание SPARTAN SPX Series

Страница 1: ...AN series of explosion protected bulkheads are specialist devices certified for use in specific operating environments The units must be installed in accordance with these instructions must be correct...

Страница 2: ...nstructed from marine grade aluminium and toughened glass The end user must ensure that these materials are suitable for the environment the SPARTAN unit will be installed in Zone 1 and Zone 2 Hazardo...

Страница 3: ...0003 Page 3 Revision B 2 INSTALLATION Mounting SPARTAN Unit 1 To meet the requirements of certification a MINIMUM of 2 fixing points must be used the fixing points must be suitable for the conditions...

Страница 4: ...upplied without the mounting brackets fitted these can be found in a polythene bag in the main carton and should be secured to the rear of the unit before installation The bolts packaged along with th...

Страница 5: ...ed and the unit charged for 24 hours and then discharged repeated 3 times to bring the battery up to peak capacity 9 If a 4 core cable is used on emergency luminaires L Ls N and E the link cable at th...

Страница 6: ...60Hz IP Rating IP66 67 Weight std 5Kg 6Kg Dimensions See previous pages for line diagrams ATEX and IECEx Rating See below PROTECTION CERTIFICATION CML13ATEX3007 or IEC Ex CML14 0001 II 2 GD Ex em IIC...

Страница 7: ...t 50 option SPX BL24 W 120120 Spartan Bulkhead 24 LED White Light 120 option SPX BL24 W 3510 Spartan Bulkhead 24 LED White Light 35x10 SPX BL24 W 6025 Spartan Bulkhead 24 LED White Light 60x25 SPX BL2...

Страница 8: ...ane Eccleston Chester CH4 9JN Certificate numbers CML13ATEX3007 or IEC Ex CML14 0001 Quality Assurance Notification Sira Equipment Marking II 2 GD Ex em IIC T4 or T5 Gb Ta 52 o C to 55 o C or II 2 GD...

Отзывы: