Division 23 52 33.13 - 5

 

1.  Safeties (2.2 - F) 
2.  Operating Controls (2.3) 
3.  Static and full load gas supply pressure 
4.  Gas manifold and blower air pressure 

C.  Submit copy of start-up report to Architect and Engineer. 

3.3 

TRAINING 

A.  Provide factory-authorized service representative to train maintenance personnel on procedures 

and schedules related to start-up, shut-down, troubleshooting, servicing, and preventive 
maintenance. 

B.  Schedule training at least seven days in advance. 

 

 

END OF SECTION 

 
 
 