background image

2

Kit Contents

Each kit includes:

(1)  Temperature and Pressure gauge
(1)  Pre-wired Flow Switch with outdoor cover
(2)  Paddles
(1)  Screw, #6-32 x 3/16
(1)  2” CPVC Tailpiece Connector
(1)  2” CPVC Manifold Adapter
(1)  O-Ring
(2)  Female spade terminals
(1)  Ring nut

This kit is primarily intended for jurisdictions requiring
the  addition  of  a  flow  switch  and/or  temperature  and
pressure gauge on pool heaters.

Before Starting

1) Turn off power to the heater at the circuit breaker.

2) Turn off gas supply.

3) Shut off the water supply to the heater.

4) Allow heater to cool down before attempting work.

INSTALLATION

1. Remove main front panel door and set aside.

2. Remove  the  front  control  panel  screws  (2  each

located  at  the  ends  of  the  panel).  Lower  front
panel to expose the main circuit board.

3. Remove  transformer  cover  located  on  either  the

upper right or left side.

4. Locate  conduit  opening  above  power  conduit

opening on the waterside of the heater.

5. Locate the Inlet/Outlet header. 

6. Install  2”  flanges  to  header  ports,  if  not  already

installed. 

NOTE:

These instructions are intended primarily for

use  by  qualified  personnel  specifically  trained  and
experienced in the installation of this type of heating
equipment  and  related  system  components.
Installation and service personnel must be licensed
in  some  states.  Persons  not  qualified  shall  not
attempt to install this equipment nor attempt repairs
according to these instructions.

DANGER - SHOCK HAZARD:

Make sure electri-

cal  power  to  the  heater  is  disconnected  to  avoid
potential serious injury or damage to components.

PLUMBING

CPVC TAILPIECE
O-RING & RING NUT
(SUPPLIED)

CPVC MANIFOLD
(SUPPLIED)

T&P GAUGE
(SUPPLIED)

GASKETS, FLANGES
& BOLTS
(WITH ORIGINAL EQUIPMENT)

FLOW SWITCH COVER
(SUPPLIED)

MALE CPVC CONNECTOR
(WITH ORIGINAL EQUIPMENT)

Fig. 1: Flow Switch and Temperature and Pressure Gauge

Содержание C-R206AE-406AE

Страница 1: ...MELL GAS Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your gas supplier from a neighbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department Installation and service must be performed by a qualified installer service agency or the gas supplier NOTE Not for use wit...

Страница 2: ... either the upper right or left side 4 Locate conduit opening above power conduit opening on the waterside of the heater 5 Locate the Inlet Outlet header 6 Install 2 flanges to header ports if not already installed NOTE These instructions are intended primarily for use by qualified personnel specifically trained and experienced in the installation of this type of heating equipment and related syst...

Страница 3: ...ing nut to con nect to your outlet plumbing 15 Using the original equipment male CPVC connec tor install your inlet plumbing 16 Locate the pre wired hard conduit off the flow switch and route through the upper control panel as indicated in Fig 2 17 Cut the white spare jumper located on the back of the circuit board in the upper control panel See Fig 3 18 Strip 1 4 of insulation from each end of th...

Страница 4: ...all front main panel door onto the heater 23 Turn water on to the heater and check for leaks a If leaks are found repair immediately 24 Turn on gas to the heater 25 Turn on power to the heater 26 Cycle the heater a few times to verify flow switch operation www raypak com Raypak Inc 2151 Eastman Avenue Oxnard CA 93030 805 278 5300 Fax 805 278 5468 Litho in U S A FLOW SWITCH WIRES CONNECTED TO SPARE...

Отзывы: