Raypak 181/182 Скачать руководство пользователя страница 4

Receiving Equipment

On receiving your equipment, check the carton visual-

ly for external damage. If the carton is damaged, make

a note on the Bill of Lading when signing for the equip-

ment. Remove the complete assembly from the carton

if it is damaged, and report the damage to the carrier

immediately. Be sure that you receive the number of

packages indicated on the Bill of Lading. Claims for

shortages and damages must be filed with the carrier

by consignee.

Purchased parts are subject to replacement only

under the manufacturer's warranty. Debits for defec-

tive replacement parts will not be accepted and

defective parts will be replaced in kind only per our

standard warranties.

When ordering parts, you must specify Model and

Serial Number of the unit. When ordering under war-

ranty conditions, you must also specify date of

Installation.

Raypak recommends that this manual be reviewed

thoroughly before installing the D-2 Power Vent. If

there are any questions which this manual does not

answer, please contact your local Raypak

Representative.

THIS MANUAL SHOULD BE MAINTAINED IN LEGI-

BLE CONDITION AND KEPT ADJACENT TO THE

UNIT.

General Specifications

The D-2 Power Vent Assembly is tested and certified

to the latest edition of the American National Standard

ANSI Z21.56. standard for pool heaters, Z21.10.3 for

water heaters and Z21.13 for boilers.

The Power Vent Assembly is a fan assisted combus-

tion system designed for application to Raypak Heater

Models 181-401. The unit, when installed as directed,

is capable of operating in applications such as through

the wall venting and reduced horizontal and vertical

vent pipe sizes in new and existing installations.

The D-2 Power Vent assembly includes a blower with

a 120/240 volt 60 Hz 1.0/1.95A 3200 RPM motor, a

plenum complete with a draft proving switch and a

motor relay. When provided for field mounting the

assembly is equipped with a wire harness.

Installation

The equipment must be installed in accordance with

local codes, or in the absence of local codes with the

latest edition of the National Fuel Gas Code, ANSI

Z223.1, the National Electrical Code, ANSI/NFPA 70.

The equipment shall be installed in accordance with

those installation regulations in force in the local area

where the installation is to be made. These shall be

carefully followed in all cases. Authorities having juris-

diction shall be consulted before installations are

made.

Mounting the Assembly

Follow these instructions if the Power Vent

venting system was purchased as an

optional assembly kit.

1. Remove existing pagoda top (outdoor units) or

drafthood (indoor units). To remove the pagoda top,

push the four brackets inward and pull up the pagoda

top. The pagoda may then be discarded.

2. Unscrew the four screws holding the outer top using

a phillips screw driver. Remove the jacket top.

3. Replace the inner stack adapter. If the heater had a

drafthood installed previously, remove the inner stack

adapter and replace it with the Power Vent stack

adapter. Otherwise, install the Power Vent stack

adapter.

4. Unscrew the access panel on the right side of the

appliance. Set aside the screws with the access panel.

5. Remove the knurled screw holding the front door

and set it aside with the door.

6. Mount the jacket top above the unit. Note: Do not

install at this point.

4

Table A: Draft Assembly Application and Kit Numbers

Model No.

Minimum

Connection

Diameter

Kit

Number

Factory

Wired

181/182

4”

008757

120V

260/261

4”

008757

120V

330/331

4”

008758

120V

400/401

4”

008758

120V

NOTE:

The D-2 Power Vent comes factory-wired for

120V, but can be field-converted for 240V operation.

See wiring diagrams.

Содержание 181/182

Страница 1: ...n an explosion or fire WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your gas supplier from a...

Страница 2: ...8 reflects the following Changes to Fig 2 on page 5 Fig 4 on page 7 Fig 5 on page 8 Dimensional Drawing on page 13 Illustrated Parts List on page 15 Additions Note on page 4 Wiring Diagrams on pages...

Страница 3: ...presence of hazards or unsafe practices which could cause severe personal injury death or substantial property damage if ignored CAUTION Indicates the presence of hazards or unsafe practices which co...

Страница 4: ...blower with a 120 240 volt 60 Hz 1 0 1 95A 3200 RPM motor a plenum complete with a draft proving switch and a motor relay When provided for field mounting the assembly is equipped with a wire harness...

Страница 5: ...t down to the appli ance 10 If the appliance is a 181 182 330 or 331 remove the tabs underneath the power vent using a 5 16 nut driver and relocate them closer to the center of the Power Vent as shown...

Страница 6: ...e 4 ft 1 2m below or to side of opening 1 ft 30 cm above opening 3 ft 91 cm K Clearance to mechanical air supply inlet 3 ft 91 cm above if within 10 ft 3m horizontally 6 ft 1 83m L Clearance above pav...

Страница 7: ...d through the length of horizon tal run For appliances installed in extreme cold climate it is recommended that a The vent be installed with a slight upward slope of not more than 1 4 per foot of hori...

Страница 8: ...ctive controls in the heater control box The harness is of sufficient length to fit the appliance for which it is sized Reference the wiring diagram supplied with each appliance for actual connections...

Страница 9: ...9 Wiring Diagrams 182 260 H4 WH1 Atmospheric...

Страница 10: ...10 181 261 H4 WH1 Low NOx...

Страница 11: ...11 Wiring Diagrams 330 400 H4 WH1 Atmospheric...

Страница 12: ...12 331 401 H4 WH1 Low NOx...

Страница 13: ...TA Model No A B C D 181 18 13 12 38 7 88 4 25 182 18 13 12 38 7 88 4 25 260 18 13 12 38 7 88 4 25 261 18 13 12 38 7 88 4 25 330 17 50 15 75 7 63 6 00 331 17 50 15 75 7 63 6 00 400 17 50 15 75 7 63 6 0...

Страница 14: ...power switch 4 Set operating control to call for heat a Fan motor starts draft proving switch clos es b Heater pump starts flow switch closes c Ignition module energized d Check for spark at gas pilo...

Страница 15: ...8 6 8 0 0 x o B e u l F 5 6 Base Assembly 008684F 008685F F 6 8 6 8 0 0 F 6 8 6 8 0 0 r a l l o C e u l F 7 F 8 8 6 8 0 0 F 7 8 6 8 0 0 r o t p a d A e u l F 8 F 9 8 6 8 0 0 F 9 8 6 8 0 0 e g n a l F...

Страница 16: ...www raypak com Raypak Inc 2151 Eastman Avenue Oxnard CA 93030 805 278 5300 Fax 805 278 5468 Litho in U S A...

Отзывы: