Rev. 2
reflects the following:
Changes to:
Fig. 1, 2 and 3 on page 6; the
Relief Valve Installation and Piping
section on
page 14; Fig. 14–16 on page 16; Fig. 17 on page 17; Table I on page 18; step 6 of the
Heater Sequence of Operation
sec-
tion on page 36; the
Wiring Diagrams
on pages 40 and 41.
The addition of:
A caution note to the
Pool/Spa Water
Chemistry
section on page 19; a wiring diagram note on the bottom of page 39.
California Hot Water Supply, Inc.
(800) 249-7244
2