Wuhan Raycus Fiber Laser Technologies Co., Ltd.
User Guide of RFL-C20000TZ
30
Figure 17 Schematic diagram of the internal electrical circuit of the laser
Note:
RFL-C20000TZ laser power control part contactors K1 and K2 are used in parallel with 2 50A
and 1 32A contactors, and 6 signal terminals are used in series.
4.7. Start operation sequence
a) Turn on the water cooler, check whether the water pipe is leaking, turn off the water cooler and
connect electrically.
b)Make sure the circuit breaker is in a OFF state and the stop button on the front panel of the laser
EMERGENCY STOP pressed; all electrical connections must be completed before the laser is
powered on.
c) Confirm that the three-phase electrical connection is correct and the power supply meets the
specifications of the power supply.