Gland connector
Explosion-proof
motor
MI cable
Large
expansion
loop
5 engaged
threads
Figure 18: Expansion loop at cable end to absorb vibration
To connect MI cable to a junction box, motor, or other
equipment approved for use in hazardous areas, screw
the gland connector into the threaded hub and tighten to
the recommended torque. If making a field termination,
ensure that the termination kit is the correct type for the
area classification (see Figure 22 on page 30 and Figure 23
on page 31). Use up excess cable by forming the cable
into a loop as shown in Figure 19. All installations must
be in compliance with the applicable requirements of the
NEC / CEC and any other applicable national or local codes
and standards.
Five engaged
threads
Tighten gland connector
to recommended torque
Explosion proof
junction box
Hub
Form excess
MI cable into
a loop
Figure 19: MI cable connection into junction box
5 INSTALLATION
nVent.com | 27
Содержание pyrotenax Alloy 825
Страница 1: ...MI Cable Industrial Wiring Installation Manual For Alloy 825 Sheath Cables ...
Страница 4: ...iv nVent com ...
Страница 14: ...Right Wrong Right Wrong Reel Coil Figure 5 Unreeling uncoiling cable 3 STORAGE AND HANDLING 10 nVent com ...
Страница 46: ...42 nVent com ...
Страница 47: ...nVent com 43 ...