![Rayburn Heatranger 216SFW Скачать руководство пользователя страница 2](http://html.mh-extra.com/html/rayburn/heatranger-216sfw/heatranger-216sfw_installation-instructions-manual_789470002.webp)
DESN 513402 A
6. If burning solid fuel with 1in B.S.P., or 28mm copper
flow and return pipes less than 7m each in length a
towel rail/radiator with a surface area of up to 1m
2
should be fitted and suitably valved to close off the
circulation in the event of a change to wood burning.
Domestic Hot Water and Heating (solid fuel)
When fitted for domestic hot water and heating burning
solid fuel the cooker will, with a burning rate to maintain
an oven temperature of 205-220°C (400-430°F), also
heat 9.3m
2
of radiator surface and pipes.
The recommended heating surface area is based on an
average heat emission of 0.5kW/m (160Btu/f h). The flow
and return pipes from the cooker should be connected to
a 190 litres
indirect cylinder
and the flow should be
vented.
Domestic Hot Water and Heating (wood)
When fitted for domestic hot water and heating burning
wood the cooker will also heat 5m
2
radiator surface and
pipes, but increased burning rate of the fuel must be
obtained to achieve this.
The recommended heating surface area is based on an
average heat emission of 0.5kW/m
2
. The flow and return
pipes from the cooker should be connected to a 190 litre
indirect cylinder
and the flow be vented.
PREPARATION OF SITE
The non-combustible hearth must be solid and level and
together with the walls adjacent to the cooker and
chimney, conform to current Building Regulations.
The cooker and chimney flue installation should be in
accordance with the relevant recommendations of
BS.8303 and BS EN 15287-1:2007, and the central
heating system to BS. 5449 Part 1.
The boiler installation section must also be in
accordance with the bylaws of the local Water
Undertaking, Regulations for the Electrical Equipment of
Buildings published by the Institute of Electrical
Engineers and any relevant requirements of the Local
Authority.
There is no requirement for an electrical power supply
but ensure that any electrical wiring is correctly earthed.
2
ELECTRICAL CONNECTIONS
The installation of any electrical services during the
installation of this boiler and the associated heating
system must be carried out by a registered competent
electrician and in accordance with the requirements of
the latest issue of BS 7671.