28
P/N 42-9470 11/07 Copyright 2007 Mestek, Inc.
Cast iron condensing boiler
Cast iron condensing boiler
— Installation and operation manual
Vent piping (and air piping when used)
All
200i
boilers must be vented using only the materials listed in the
200i
Vent/Air manual. Th e vent installation must meet
requirements for direct vent (when air is ducted to the boiler air intake) or ANSI Category IV venting (when air is taken from
the boiler room).
DO NOT install a
200i
boiler on a common vent system. All
200i
boilers must be individually vented. Failure to
comply could result in improper operation of any of the appliances on the vent system, resulting in possible severe
personal injury, death or substantial property damage.
When a
200i
boiler replaces a boiler that shared a common vent system, follow the guidelines below to check operation of the remaining
appliance(s).
BEFORE PROCEEDING FURTHER
— Install the vent (and air) piping according to the
200i
Vent/Air manual.
Common vent systems
If an existing boiler is removed from a common venting system,
the common venting system may then be too large for the proper
venting of the remaining appliances connected to it. At the time of
removal of an existing boiler, the following steps shall be followed
with each appliance remaining connected to the common venting
system placed in operation, while the other appliances remaining
connected to the common venting system are not in operation.
Seal any unused openings in the common venting system.
Visually inspect the venting system for proper size and hori-
zontal pitch and determine there is no blockage or restriction,
leakage, corrosion and other defi ciencies which could cause
an unsafe condition.
Insofar as is practical, close all building doors and windows and
all doors between the space in which the appliances remain-
ing connected to the common venting system are located
and other spaces of the building. Turn on clothes dryers
and any appliance not connected to the common venting
system. Turn on any exhaust fans, such as range hoods and
bathroom exhaust, so they will operate at maximum speed.
Do not operate a summer exhaust fan for a boiler installation.
Close fi replace dampers.
Place in operation the appliance being inspected. Follow
the lighting instructions. Adjust thermostat so appliance
will operate continuously.
Test for spillage at the draft hood relief opening aft er 5 min-
utes of main burner operation. Use the fl ame of a match or
candle, or smoke from a cigarett e, cigar or pipe.
Aft er it has been determined that each appliance remaining
connected to the common venting system properly vents when
tested as outlined above, return doors, windows, exhaust
fans, fi replace dampers and any other gas-burning appliance
to their previous condition of use.
Any improper operation of the common venting system
should be corrected so the installation conforms with the
National Fuel Gas Code, ANSI Z223.1/NFPA 54. When
resizing any portion of the common venting system, the
common venting system should be resized to approach the
minimum size as determined using the appropriate tables in
Appendix F in the National Fuel Gas Code, ANSI Z223.1/
NFPA 54 and or CSA B149 Installation Codes.
1.
2.
3.
4.
5.
6.
7.
Systèmes d’évacuation d’communs
Au moment du retrait d’une chaudière existante, les mesures sui-
vantes doivent être prises pour chaque appareil toujours raccordé
au système d’évacuation commun et qui fonctionne alors que
d’autres appareils toujours raccordés au système d’évacuation ne
fonction-nent pas: système d’évacuation
Sceller toutes les ouvertures non utilisées du sys-tème
d’évacuation.
Inspecter de façon visuelle le système d’évacu-ation pour
déterminer la grosser et l’inclinaison horizontale qui con-
viennent et s’assurer que le système est exempt d’obstruction,
d’étranglement de fruite, de corrosion et autres défaillances
qui pourraient présenter des risques.
Dans la mesure du possible, fermer toutes les portes et les
fenêtres du bâtiment et toutes les portes entre l’espace où les
appareils toujours raccordés du système d’évacuation sont
installés et les autres espaces du bâtiment. Mett re en marche
les sécheuses, tous les appareils non raccordés au système
d’évacuation commun et tous les ventilateurs d’extraction
comme les hott es de cuisinère et les ventilateurs des salles
de bain. S’assurer que ces ventilateurs fonctionnent à la
vitesse maximale. Ne pas faire fonctionner les ventilateurs
d’été. Fermer les registres des cheminées.
Mett re l’appareil inspecté en marche. Suivre les instructions
d’allumage. Régler le thermostat de façon que l’appareil
fonctionne de façon continue.
Faire fonctionner le brûleur principal pendant 5 min ensuite,
déterminer si le coupe-tirage déborde à l’ouverture de
décharge. Utiliser la fl amme d’une allunett e ou d’une chan-
delle ou la fumée d’une cigarett e, d’un cigare ou d’une pipe.
Une fois qu’il a été d éterminé, selon la métode indiquée ci-dessus,
que chaque appareil raccordé au système d’évacuation est
mis à l’air libre de façor adéquate. Remett re les portes et les
fenêtres, les ventilateurs, les registres de cheminées et les ap-
pareils au gaz à leur position originale.
Tout mauvais fonctionnement du systéme d’évacu-tion
commun devrait étré corrigé de façor que l’instal-lation soit
conforme au National Fuel Gas Code, ANSI Z223.1/NFPA
54 et (ou) aux codes d’installation CSA-B149. Si la grosseur
d’une section du système d’ évacuation doit étré modifi ée,
le système devrait étré modifi é pour respecter les valeurs
minimales des tableaux pertinents de l’appendice F du Na-
tional Fuel Gas Code, ANSI Z223.1/NFPA 54 et (ou) des
codes d’installation CSA-B149.
1.
2.
3.
4.
5.
6.
7.
9