9.) QA/QC Walkthrough
1.
After all conduit, trenching, terminations and labeling has been completed to a
satisfactory level, begin the QA/QC walkthrough using the “RaVolt QA/QC
Inspection Sheet”.
2.
Thoroughly inspect all aspects of the completed work. The inspection sheet
highlights all important components to be inspected.
3.
The “RaVolt QA/QC Inspection Sheet must be completed and signed off on by a
representative of the install team for warranty registration.
4.
Correct any issues seen during the inspection and document these corrections on
the inspection sheet.
10.) Commissioning & Photos
Take photos of the following items for documentation:
1.
RaVolt enclosure and pad placement
2.
Installed anchoring hardware
3.
Drip edge installed on top of enclosure
4.
All conduit connections
5.
All grounding & neutral to ground bond
6.
Load center terminations (AC Output-2 hot, 1 neutral, 1 ground)
7.
Disconnect terminations (Grid/Gen Input-2 or 4 hot, 1 or 2 neutral, 1 or 2 ground)
8.
DC Disconnect terminations (Each PV string within disconnect)
9.
Two wire start termination at Sol-Ark inverter
10.
Trickle charge termination at terminal blocks within RaVolt enclosure
11.
Battery communication cables
12.
Heater setting
13.
Fan setting
14.
Any notable issues or blemishes on equipment
15.
All placed labels
16.
All communication connections
17.
Functioning Wi-Fi dongle
18.
Any additional RaVolt options (Project specific details)
Commissioning Steps