background image

    

  

44

7  

      

SERVICING INSTRUCTIONS

        Ravenheat is a member of  the  Benchmark 
        initiative and fully supports the aims of the 
        programme. 
        Benchmark was instructed to improve the  
        standards of installation and commissioning 
        of central heating systems in the UK and 
        to encourage the regular servicing of all 
        central heating systems to ensure safety and 
        efficiency.

        During routine servicing, and after any 
        maintenance or change of part of the 
        combustion circuit, the following must be 
        checked:
       - The integrity of the flue system and the 
          flue seals.
       - The integrity of the boiler combustion 
          circuit and the relevant seals.
       - The operational dynamic (working) gas 
          inlet pressure at maximum rate.
      -  The gas rate.
      -  The combustion performance (Refer to 

(Refer to 

          table 9 and page 64).

          table 9 and page 64).
      -  Check all joints and connections in the 

      -  Check all joints and connections in the 
         appliance and remake any that show signs 

         appliance and remake any that show signs 
         of leakage.

         of leakage.

        

        

NOTE: 

NOTE: 

        Service consumables are not covered by 

        Service consumables are not covered by 
        the warranty. 

        the warranty. 
        To view warranty exclusions please visit 

        To view warranty exclusions please visit 
        www.ravenheat.co.uk 

        www.ravenheat.co.uk 
        or contact us on 01132 527007.

        or contact us on 01132 527007.

COMPETENCE  TO CARRY OUT THE CHECK 

COMPETENCE  TO CARRY OUT THE CHECK 
OF COMBUSTION PERFORMANCE.

OF COMBUSTION PERFORMANCE.

     Please note: BS6798:2009 Specification for 

     Please note: BS6798:2009 Specification for 
     installation and maintenance of gas-fired 

     installation and maintenance of gas-fired 
     boilers of rated input not exceeding 70 kW 

     boilers of rated input not exceeding 70 kW 
     net advises that:

     net advises that:
      -  The person carrying out a combustion 

      -  The person carrying out a combustion 
         measurement should have been a

         measurement should have been assessed 
         as competent in the use of a flue gas 
         analyser and the interpretation of the 
         results.
      -  The flue gas analyser used should be one 
         meeting the requirements of BS7927 or  
         BS-EN 50379-3 and be calibrated in 
         accordance with the analyser 
         manufacturers requirements.
      -  Competence can be demonstrated by 
         satisfactory completion of th

satisfactory completion of the CPA1 ACS 

         assessment which covers the use of 
         electronic portable combustion gas 
         analysers in accordance with BS 7967, 
         Parts 1 to 4.

             

7.1  BOILER FROST PROTECTION

      The appliance has a built in frost protection 
      device that protects the boiler from freezing. 
      With the gas and electric supplies ON and 
      irrespective of any room thermostat setting, the 
      frost protection device will operate the pump 
      when the temperature falls below 10 °C and 
      will operate the burner when the temperature 
      falls below 5°C.
      The burner will switch off when the temperature 
      reaches 27 °C. When the frost protection 
      device operates “AF” is displayed on the digital 
      display.

      IMPORTANT NOTE

:

        The system should be protected by incorporating 
      a system frost thermostat.

      To ensure continued efficient operation of 
      the appliance it is necessary to carry out 
      servicing and cleaning at regular intervals.
      The frequency of servicing and cleaning will 
      depend upon the particular installation 
      conditions and usage but in general, once a 
      year is advisable.

WARNING:
Before the start of any servicing or
replacement of components always
isolate the electricity supply to the 
appliance and always turn off the 
appliance gas supply at the gas 
service cock.

   The data badge is positioned low on the 
    inside left panel.

 - The following notes apply to the appliance 

and its controls but it should be remembered 
that attention must also be paid to the heating 
and hot water circuits with special attention to 
radiator valves, thermostats, clocks, leaking 
hot water taps etc.

-  Where it is necessary to replace a gasket that 

relies on adhesive for securing - this adhesive 
will be supplied with the gasket as a spare 
item.

-  In all cases prior to servicing, remove the front 

panel of the case. Operate the  appliance by 
turning the hot water services on to a high 
water flow. Measurement of the products of 
combustion can be achieved   by connection 
of a probe to the combustion analyser test 
point.

 

                  

Combustion testing must be carried out  by competent person    

                                    using a combustion analyser conforming to BS7927. 

Содержание HE 80 T

Страница 1: ...VENHEAT MANUFACTURING LTD CHARTISTS WAY MORLEY LEEDS U K LS27 9ET TEL 0113 252 7007 FAX 0113 238 0229 Website www ravenheat co uk E mail sales ravenheat co uk Instructions for Use Installation and Ser...

Страница 2: ...2...

Страница 3: ...ger for super high heat transfer to domestic hot water supply Stainless steel plate heat exchanger for super high heat transfer to domestic hot water supply Built in frost protection Built in frost pr...

Страница 4: ...SLQJ URRI VXFWLRQ 7HFKQLFDO GDWD 7 U3 1DW JDV IURP YHUWLFDO ZDOO 7HFKQLFDO GDWD 7 U3 3 KDXVW VXFWLRQ V VWHP ZLWK WZR 7HFKQLFDO GDWD 7 U3 1DW JDV VHSDUDWH SLSHV WKURXJK D VLQJOH 7HFKQLFDO GDWD 7 U3 3 Y...

Страница 5: ...H FKDQJHU 7R UHPRYH UHSODFH H SDQVLRQ YHVVHO 7R UHPRYH UHSODFH JDV YDOYH 7R UHPRYH UHSODFH SODWH KHDW H FKDQJHU 7R UHPRYH UHSODFH WKH ZDWHU SUHVVXUH WUDQVGXFHU 7R UHPRYH UHSODFH GLYHUWHU YDOYH PRWRU 7...

Страница 6: ...APPLIANCE CHECKING THE SYSTEM YOUR APPLIANCE CHECKING THE SYSTEM PRESSURE PRESSURE Before lighting the appliance check that the Central Before lighting the appliance check that the Central Heating sy...

Страница 7: ...domestic hot water temperature DHW 5 power of modulation 6 fan speed FAN the display show 2 digits e g 20 2000 rpm 7 external temperature if the external probe is present OTC 8 error history 9 error h...

Страница 8: ...g 1 to esc time function KEY 1 Day indicator time clock version only 1 Monday 1 Monday 2 Tuesday 2 Tuesday 3 Wednesday 3 Wednesday 4 Thursday 4 Thursday 5 Friday 5 Friday 6 Saturday 6 Saturday 7 Sunda...

Страница 9: ...these days but Sunday will remain the same as table one unless changed individually If you wish to override these times press the timer mode button to select MAN this puts the boiler in manual mode w...

Страница 10: ...sure relief valve 12 Water pressure transducer 13 CHreturn 14 Controlboard 15 Circulation pump 16 Automaticairvent 17 Condensatedrain 18 Expansionvessel 19 Mainheatexchanger 20 Sparkelectrode 21 Sensi...

Страница 11: ...ctrode 12 Sensor electrode 13 Fan 14 Flue temperature temperature sensor 15 Expansion vessel 16 Automatic air vent 17 Circulation pump 18 Water pressure transducer 19 Safetypressurereliefvalve 20 Dive...

Страница 12: ...f central heating and domestic hot water combined in one unit It is tted with an automatic domestic hot water priority valve It is possible to select either a summer or It is possible to select either...

Страница 13: ...r When DHW is no longer required the burner When DHW is no longer required the burner and pump and fan will immediately turn o and pump and fan will immediately turn o This also takes place when in wi...

Страница 14: ...1066 I h 20 C rise Minimum ow rate C H 350 l h D H W ow rate 30 C rise 11 9 l min D H W ow rate 35 C rise 10 2 l min D H W ow rate 40 C rise 8 9 l min 10 C Inlet temperature D H W temperature Max 60...

Страница 15: ...ing operating temperature Max 80 C min 35 C Design ow rate 1066 I h 20 C rise Minimum ow rate C H 350 l h D H W ow rate 30 C rise 11 9 l min D H W ow rate 35 C rise 10 2 l min D H W ow rate 40 C rise...

Страница 16: ...eating operating temperature Max 80 C min 35 C Design ow rate 1811 I h 20 C rise Minimum ow rate C H 350 l h D H W ow rate 30 C rise 14 0 l min D H W ow rate 35 C rise 12 0 l min D H W ow rate 40 C ri...

Страница 17: ...ing operating temperature Max 80 C min 35 C Design ow rate 1811 I h 20 C rise Minimum ow rate C H 350 l h D H W ow rate 30 C rise 14 0 l min D H W ow rate 35 C rise 12 0 l min D H W ow rate 40 C rise...

Страница 18: ...ler on the Gas Safe register www gassaferegister co uk Failure to install appliances correctly could lead to prosecution It is in your own interest and that of your safety to ensure the law is complie...

Страница 19: ...m containing a bath or shower any electrical switch or appliance control utilising mains electricity should be situated so that it cannot be touched by a person using a bath or shower A compartment wh...

Страница 20: ...s of BS 5440 Part 1 IMPORTANT NOTES For greater ue lengths see alternative ue instructions Flue must be positioned in a place not likely to cause a nuisance from pluming IMPORTANT NOTICE If the ue ter...

Страница 21: ...21 4 10 FLUE TERMINAL POSITION...

Страница 22: ...have a gradient to ensure air is carried naturally to air release to ensure air is carried naturally to air release points and water flows naturally to drain points and water flows naturally to drain...

Страница 23: ...sion see table 4 and add additional sealed expansion capacity as additional sealed expansion capacity as appropriate Fig 7 In general modern appropriate Fig 7 In general modern systems below 7 L shoul...

Страница 24: ...and invalidate the appliance guarantee and contravene the Building Regulations contravene the Building Regulations It is recommended that you fit a primary It is recommended that you fit a primary wat...

Страница 25: ...appliance except where the appliance is installed in a bathroom The current electrical IEE Wiring regulations must be followed in UK 5 INSTALLATION 5 1 WARNING It is MOST IMPORTANT that this appliance...

Страница 26: ...0 52 Self cutting joint securing 52 Self cutting joint securing screw screw 57 Elbow header 59 Rubber seal 60 56 Rubber seal 100 60 Fumes sample point 61 Flue exhaust duct 62 Air intake duct 69 Air sa...

Страница 27: ...ng Fig 12a FLUE EXHAUST DEFLECTION BEND Fig 12a Flue exhaust de ection bend are also available These come in both 45 and 90 degree versions These bends t directly onto the ue exhaust terminal to de ec...

Страница 28: ...en the a good seal is made with O rings Tighten the two screws on the flue flange to secure the two screws on the flue flange to secure the elbow header in place and fix securing screws elbow header i...

Страница 29: ...tion 5 5 Extensions must instructions in section 5 5 Extensions must be installed with the widened end of the air be installed with the widened end of the air intake pipe and the tapered end of the fl...

Страница 30: ...osite the extension s straight end NOTE A suitable support bracket flue bracket is available from Ravenheat and should be used to support the flue length at least every one metre preferably at each jo...

Страница 31: ...int 61 STD ue exhaust duct 62 Terminal 63 Flue extension 64 Flue exhaust duct extension 65 Flue manifold rubber seal 66 Securing screw 67 Flue temperature sensor 69 Air sample point 127 Terminal Rubbe...

Страница 32: ...re line is vertical and that the flue centre line is virtually below the point at which the flue will exit the roof Ensure that the maximum permissible flue permissible flue length is not exceeded fig...

Страница 33: ...om the outside Lift the boiler on the wall locating onto the top two fixing bolts Tighten the two bolts using a spanner to secure to the wall Measure the vertical distance between the top of the flue...

Страница 34: ...located into the ue manifold and lubricate the internal part of the seal before assembly the internal part of the seal before assembly Locate the header gasket on the twin ue Locate the header gasket...

Страница 35: ...Exhaust ue must slope 1 5 down towards the boiler 25 mm fall per metre Exhaust suction system with two separate pipes through a single vertical wall g 26 Maximum distance D L L1 37 metres Minimum dist...

Страница 36: ...fig 27 Part No Description PR5094110A Straight ue header sample point 60 100 PRO110300 Flue Extension 80 125 L1000 RID110050 125 80 to 100 60 Flue reducer CUR110250 45 ue bend 80 125 CUR110300 90 elb...

Страница 37: ...TING CONNECTION Fig 29 Before any central heating connections are made to the boiler all system valves should be opened and the system thoroughly flushed out with cold water Connect the central heatin...

Страница 38: ...if possible be discharged into the household internal drainage system If this is not practicable discharge can be allowed into the external household drains or a purpose designed soak away It is recom...

Страница 39: ...ock which is a 3 core cable which is a 3 core cable of 0 75 mm2 24x0 2 mm to BS 6500 Make sure all wires to the appliance are routed away from sharp edges and hot surfaces The cable must be fastened w...

Страница 40: ...hat they clock and thermostat make sure that they are calling for heat are calling for heat Select winter function the winter icon in Select winter function the winter icon in digital display will be...

Страница 41: ...with the valve inlet pressure test point fig 35 with the boiler operating at full rate boiler operating at full rate Check with the Local Gas supplier if the Check with the Local Gas supplier if the...

Страница 42: ...le pressure flow regulator should be fitted on the cold water supply to the appliance Slowly close the draw off tap to reduce the flow rate to the min approx 2 8 L min Select a different temperature f...

Страница 43: ...1 for 5 seconds to enter in item 6 and 4 fig 1 for 5 seconds to enter in USER PARAMETERS mode USER PARAMETERS mode Use arrow up and arrow down buttons Use arrow up and arrow down buttons item 3 and 4...

Страница 44: ...librated in accordance with the analyser manufacturers requirements Competence can be demonstrated by satisfactory completion of th satisfactory completion of the CPA1 ACS assessment which covers the...

Страница 45: ...ter at any remaining debris by spraying water at any remaining debris through the condensate trap through the condensate trap Ensure the water is kept away from Ensure the water is kept away from elec...

Страница 46: ...s must be carried out by a competent person Before replacing any parts the boiler should be isolated from the mains electric supply and the gas should be turned off at the service cock on the boiler A...

Страница 47: ...om the fan the fan U Unscrew the screws to the burner cover and remove the cover with the fan To remove the burner unscrew the screws in the lower cover side Replace in reverse order always fitting a...

Страница 48: ...ed check combustion CO2 and adjust if necessary see section 6 9 8 10 TO REMOVE REPLACE PLATE HEAT EXCHANGER Fig 44 Remove the front and bottom panels fig 39 40 Remove the panel control box sect 8 23 C...

Страница 49: ...rew the nut that fastens the pump to Unscrew the nut that fastens the pump to the CH pipe and remove the pump and the CH pipe and remove the pump and remove the securing clip at the pump remove the se...

Страница 50: ...connecting ensure the correct wires go to the relevant sensor the polarity on each one is unimportant 8 20 TO REMOVE REPLACE FLUE SENSOR Fig 3 item 22 Remove the f the front panel fig 39 Detach the wi...

Страница 51: ...ew the four screws and lift up Replace in reverse order Replace in reverse order 8 25 TO REMOVE REPLACE DIGITAL 8 25 TO REMOVE REPLACE DIGITAL DISPLAY BOARD DISPLAY BOARD Remove the front panel fig 39...

Страница 52: ...supply has been purged of air The heating system pressure is at least 1 bar min to 1 5 bar max select winter position on the digital display and set the central heating temperature to maximum sect 1 5...

Страница 53: ...osition on the digital display and setting see section 9 and after selecting the summer position on the digital display and setting the domestic hot water temperature to maximum the domestic hot water...

Страница 54: ...10 ELECTRICAL SYSTEM DIAGRAM 54 Fig 55...

Страница 55: ...55 11 SPARE PARTS Fig 56...

Страница 56: ...N150050 D H W sensor 20 OTT150050 Diverter valve by pass 21 FOR150150 Diverter valve motor clip 22 MOT150050 Diverter valve motor 23 5018030 3 4 gasket GUA010250 24 RAC150100 Gas valve inlet pipe 25 T...

Страница 57: ...r gasket 49 1 GUA150120 HE 80 T burner gasket 50 BRU150050 HE 80 T burner 50 1 BRU150100 HE 98 T burner 51 FLA110050 Flue ange FLA110052 52 GUA110350 Flue ange gasket 53 GUA110250 Flue manifold washer...

Страница 58: ...oncentric flue 80 125 see sect 5 18 Part No Description PR5094110A Straight ue header sample point 60 10 PRO110300 Flue Extension 80 125 L1000 RID110050 125 80 to 100 60 Flue reducer CUR110250 45 bend...

Страница 59: ...LS27 9ET Telephone 0113 252 7007 Fax 0113 238 0229 Website www ravenheat co uk E mail sales ravenheat co uk Ravenheat reserves the right to make changes and improvements in our products which may a ec...

Страница 60: ...l heating return temp measure and record Temperature control to heating 12 For combination boilers only Temperature control to hot water 12 Scale reducer 25 Heating zone valves n a Hot water mode Auto...

Страница 61: ...61...

Страница 62: ...62...

Страница 63: ...commissioning checNlist completed in full 7o instigate the boiler guarantee the boiler needs to be registered with the manufacturer within one month of the installation 7o maintain the boiler guarante...

Страница 64: ...64 FLOWCHART FOR CO LEVEL AND COMBUSTION RATIO CHECK ON COMMISSIONING A CONDENSING BOILER...

Страница 65: ...65 12 1 ANALYSER CHECK LIST...

Страница 66: ...iler interlocN 3roYided ALL SYSTEMS 7Ke s stem Kas Eeen usKed and cleaned in accordance ZitK 6 and Eoiler manuIacturer s instructions Yes Kat s stem cleaner Zas used Kat inKiEitor Zas used 4uantit lit...

Страница 67: ...SKRQH 1R DV VDIH UHJLVWHU 1R 5HFRUG W PD UDWH 2 SSP AND 2 W PLQ UDWH KHUH 3RVVLEOH 2 SSP AND 2 RPPHQWV 6LJQDWXUH SERVICE 04 DWH QJLQHHU QDPH RPSDQ QDPH 7HOHSKRQH 1R DV VDIH UHJLVWHU 1R 5HFRUG W PD UDW...

Отзывы: