
CHAPTER
3
Manual No. 016-0171-408
7
English
Chapter 3
Base Station
Installation & Start Up
Contact your regional Raven Sales or Precision Agriculture Specialist to coordinate installation and set up of
the Slingshot™ base station.
Note:
Be sure that all required items outlined in Chapter 2, Introduction & Preparation, have been
completed prior to installing the base station.
The following sections contain instructions for installation and start up of the base station for reference during
the installation and set up of the base station.
Base Station Connections
1.
Setup the Slingshot base station unit in the prepared location.
Note:
The base station tray is compatible with a 2U 19” [48 cm] server rack for optional mounting.
FIGURE 1.
Base Station Connectors
2.
Connect the base station antenna cable to the TNC connector on the base station.
3.
Connect the cable from the surge protected ethernet ‘OUT’ port on the back of the UPS to the ethernet port
on the base station.
Ethernet
Port
TNC Antenna
Port
3-Pin Power
Adapter Port
3A Fuse
Ground
Power
(+12
VDC)
Keyway
No Connection
UPS
Management Port
Содержание Slingshot
Страница 6: ...Raven Industries Raven Industries Raven Industries GPS SBAS Raven Industries Raven Raven Industries...
Страница 26: ...Chapitre 5 18 Manuel d installation de la station de base Slingshot...
Страница 38: ...Cap tulo 8 30 Manual de instala o da esta o base Slingshot...
Страница 53: ...13 016 0171 408 45 13 Slingshot Raven Network Operations Center FCC 15 FCC 1 2...
Страница 54: ...13 46 Slingshot Raven Industries Slingshot...
Страница 57: ...Manual No 016 0171 408 49 4 DIP 5...
Страница 60: ...Chapter 14 52 Slingshot TNC...
Страница 62: ...Chapter 15 54 Slingshot 3 OUT Ethernet Ethernet 4 Ethernet 5 3 3 6 FIGURE 2...
Страница 64: ...Chapter 15 56 Slingshot Slingshot Slingshot Slingshot RTK RTK Slingshot Raven Network Operations Center...