![Raven SBGuidance Side-Shift Скачать руководство пользователя страница 18](http://html.mh-extra.com/html/raven/sbguidance-side-shift/sbguidance-side-shift_installation-manual_788993018.webp)
Pag 18/
30
I SBG-Side-Shift-IM-EN-V1.1
SBGuidance Side-Shift I Version 1.1 I CAN
2.8. Placing and connecting cabling
An Implement-ready wiring harness is required
on the tractor for connecting the Side-Shift or
drawbar steering. The IBBC connector ensures
that connection (Figure 13).
Section 2.9 shows a schematic view of the lead
connecting circuit. The CAN implement lead
ensures that the STU and DynamIQ are
connected to the tractor. In addition, the
hydraulic harness needs to be connected to the
STU. This hydraulic harness ensures the
control of the hydraulic valve and the readout of
the angle sensor.
A panel mount antenna connection mounted on
the IBBC bracket is optional (Figure 14). An
antenna cable/lead can be concealed in the
cabin between the terminal and the IBBC
bracket.
Mount the CAN implement lead in such a
way that the separate conductors coming
from the protective sleeve are directed
downwards. This will prevent any
penetration of water into the protective
sleeve.
Ensure that the leads are not damaged
when installed.
Tip: Tie-wrap the leads so that they are
attached free from vibration and friction.
Press the connectors firmly into place
until they click!
Figure 13 IBBC bracket with connector
Figure 14 IBBC bracket with panel mount for
antenna connection
Содержание SBGuidance Side-Shift
Страница 1: ...INSTALLATION MANUAL SBGuidance Side Shift Side Shift and Drawbar steering Original Instructions ...
Страница 2: ...Pag 2 30 I SBG Side Shift IM EN V1 1 SBGuidance Side Shift I Version 1 1 I CAN ...
Страница 8: ...Pag 8 30 I SBG Side Shift IM EN V1 1 SBGuidance Side Shift I Version 1 1 I CAN ...