![Raven SBGuidance Auto Скачать руководство пользователя страница 18](http://html.mh-extra.com/html/raven/sbguidance-auto/sbguidance-auto_installation-manual_788990018.webp)
SBGuidance Auto I Rev. A I CAN
Page18/52 I SBG-Auto CAN-EN-Rev. A
3.3
Hydraulic installation open center
The manifold v3 open center consists of the standard
load sense manifold v3 with an add-on open center
part (Figure 6).
The pressure line that normally runs from the hydraulic
pump to the steering orbitrol, should be connected to
the P of the add-on open center part. Then connect a
line between P1 of the manifold and the pressure line
of the orbitrol. Connect the T of the manifold to a tank
inlet (Figure 7 and Figure 8).
Connect the hoses leading from the orbitrol to A1 and
B1 on the manifold. Connect the hoses to the steering
cylinders to A and B of the manifold (Figure 7 and
Figure 8).
Figure 6 Add-on part of the open center
manifold.
Figure 7 Open center connection circuit.
Figure 8 Connections of the hydraulic open center
manifold.
Содержание SBGuidance Auto
Страница 2: ...SBGuidance Auto I Rev A1 I CAN Page2 52 I SBG Auto CAN EN Rev A1 ...
Страница 8: ...SBGuidance Auto I Rev A I CAN SBG Auto CAN EN Rev A I Page 8 52 Intentionally left blank ...
Страница 22: ...SBGuidance Auto I Rev A I CAN Page22 52 I SBG Auto CAN EN Rev A Intentionally left blank ...
Страница 44: ...SBGuidance Auto I Rev A I CAN Page44 52 I SBG Auto CAN EN Rev A Intentionally left blank ...
Страница 46: ...SBGuidance Auto I Rev A I CAN Page46 52 I SBG Auto CAN EN Rev A Intentionally left blank ...
Страница 48: ...SBGuidance Auto I Rev A I CAN Page48 52 I SBG Auto CAN EN Rev A Intentionally left blank ...