Miller Condor Series (CAN Product Control) AccuBoom Installation Manual
4
Installing the
Cable
1. Attach the AccuBoom harness to the CAN node.
2. Locate the existing bulkhead connector on the right rear corner of
chassis and disconnect. (See Figure 2)
3. Tee in AccuBoom harness between the bulkhead and the previously
disconnected harness. (See Figure 3)
4. Connect the CAN Tee cable to the AccuBoom harness and connect to
the Raven CAN Bus. Attach the terminator to the CAN tee Cable.
Figure 2: Bulkhead Connector
Figure 3: Tee in AccuBoom Harness