Use and maintenance manual RBH 150 V - RBH 200 V
Pag.38
Rev.2 15/07/2021
EN
Electrical connection
The plug of the stove’s power cable must only be connected after the installation and assembly has been completed of the
appliance, and must remain accessible after installation.
To make the electrical connection, proceed as described below:
First connect the power cable to the plug on the back of the stove and then to a wall socket.
Supply power to the stove by turning the switch to position (I).
📌
When the stove is not in use, it is advisable to disconnect the power cable.
⚠
Take care that the power cord (and any other cables outside the equipment) do not come into contact with hot surfaces.
⚠
Ensure that the electrical system is grounded.
⚠
For direct connection to the mains, it is necessary to provide a device that ensures disconnection from the mains, with a
contact opening distance that allows complete disconnection under the conditions of over-voltage category III, in accordance
with installation rules
⚠
If the power supply cable is damaged, it must be replaced by the manufacturer or its technical assistance service or in any
case by a person with similar qualifications, so as to prevent any risk.
⚠
It is recommended that authorized personnel pay special attention to the electrical connections after any work on the product.
Switch
Power plug
Fuse
Connection of external probe or thermostat
To manage the stove using an external thermostat (optional), connect it to the appropriate terminals on the board, as shown in the
Electric scheme.
📌
Connect an open/closed external thermostat, therefore potential-free.
📌
If you wish to detect the ambient temperature by means of an external thermostat (optional), this must be connected to
the appropriate connector on the rear side of the stove; and you will have to activate the reading in “SETTINGS - ENABLE
THERMOSTAT.” On display appears the writing TON / TOFF based on thermostat request.
⚠
Connect an external thermostat with a simple dry contact, therefore, not powered, moreover, we recommend you use a
thermostat with a minimum offset of 3°C if you intend to use the “comfort clima” function.
Testing and commissioning
Stove start-up must be preceded by testing, which includes an operational check of the following elements:
•
connection to the smoke evacuation system;
•
electrical connections;
•
hydraulic connections;
•
operation of any connected external probes;
•
checking that all materials used to build the smoke duct, chimney and chimney pot are regulation and suitable for use.
The testing is positive only when all operational phases have been completed without any anomaly being detected.
Содержание RBH 150 V
Страница 2: ...MANUALE D USO E MANUTENZIONE MANUEL D UTILISATION ET D ENTRETIEN RBH 150 V RBH 200 V...
Страница 3: ......
Страница 12: ......
Страница 13: ......
Страница 27: ...Manuale uso e manutenzione RBH 150 V RBH 200 V Pag 26 Rev 2 15 07 2021 IT Tavola tecnica RBH 200 V 732 777 76...
Страница 80: ......
Страница 81: ......
Страница 148: ......
Страница 150: ...USE AND MAINTENANCE MANUAL RBH 150 V RBH 200 V...
Страница 151: ......
Страница 157: ......
Страница 224: ......
Страница 226: ...BEDIENUNGS UND WARTUNGSHANDBUCH RBH 150 V RBH 200 V...
Страница 227: ......
Страница 233: ......
Страница 300: ......
Страница 302: ...MANUAL DE USO Y MANTENIMIENTO RBH 150 V RBH 200 V...
Страница 303: ......
Страница 309: ......
Страница 376: ......
Страница 378: ...HANDLEIDING VOOR GEBRUIK EN ONDERHOUD RBH 150 V RBH 200 V...
Страница 379: ......
Страница 385: ......
Страница 452: ......