This type of installation (see
fig. 4
) requires insulated chimney since the entire
smoke duct was assembled inside the house. The lower part of the flue has an
assembled “T” joint with an inspection plug.
It is not recommended to install a 90° curve as the first initial piece, since the
ash could quickly obstruct the smoke passage, causing problems for stove suc-
tion. (See
fig. 2
)
This type of installation (See
fig. 5
) does not require an insulatd flue duct be-
cause the latter is installed inside the building and a part of it is located inside
an already existing flue duct. In the lower part of the stove was intalled a T fitting
with inspection plug, like for the inner part of the flue.
It is not recommended to install a 90° curve as the first piece, since the ash
could quickly obstruct the smoke passage, compromising stove draught. (See
fig. 2
)
Protection from rain
Insulated flue
T fitting with collection
chamber and condensate
drain
Protection from rain
Cover slab
Watertight steel sheeting
In
te
rn
a
l
fl
ue
T fitting with collection and
condensate chamber
Inspection door
fig.4
fig.5
18
Содержание o-ring
Страница 1: ...en USER MANUAL O RING...
Страница 2: ......
Страница 32: ...Note...
Страница 33: ...Note USER MANUAL O RING 33...
Страница 34: ...Note 34...
Страница 35: ......