![Rave LCR-IW-B Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/rave/lcr-iw-b/lcr-iw-b_owners-manual_788578007.webp)
Drywall Installations
Contents Description Quantity
Tools Required
Pre-Construction Brackets
1.
2.
Drywall or other mounting surfaces should be at least 3/8" thick to ensure safety and
speaker stability. Speaker placement should be planned to accommodate practical
considerations such as wiring path and installation surfaces. Your professional installer
will be able to advise you of the best layout.
- Speaker Modules -2 (SIS Models -1)
- Grilles -2 (SIS Models -1)
- Paint Mask -1
- Cut-out Template -1
#2 Phillips Screwdriver
Hole Saw
Pre-construction brackets are available with all Rave Technology custom installed speakers.
These brackets are measured to fit standard 16''/24'' wood stud intervals.
Nail or Staple the pre-construction brackets to the stud in the planned speaker
position. With the flange of the speaker cut out facing out.
As the drywall installer is working, they can accurately cut-out the necessary hole for
your speaker reducing installation time and debris when the speakers are being
installed.
New Construction
Wood stud
Nail into position
Pre-construction bracket
Rave Technology
G6434 South Dort Highway, Suite 2
Grand Blanc, Michigan 48439
Tel: 1-810-953-3918
www.ravetechnology.com