background image

4.5  Switching off the system

1

e1

e2

e3

F1

F2

NET

ID CODE

PT

TOTAL

KG/LB

CLR

3 sec.

Switch off the indicator 

by pressing the on/off 

key for 3 seconds. 

4.4  Connecting and switching on the iCP

1

2

e1

e2

e3

F1

F2

NET

ID CODE

PT

TOTAL

KG/LB

CLR

Start up the 

indicator. Press 

the on/off key.

OR

Switch on the iCP:

Move the iCP quickly in upwards or 

downwards direction.

After 5 seconds all electronics are warmed up and you can start weighing.

      

      

USER MANUAL

 - 

iCP

 

      

      

USER MANUAL

 - 

iCP

 

12

13

Содержание iCP

Страница 1: ...recyclable provided that parts are being processed and disposed of in the right manner More information can be found on our website www ravas com Rev 20220421 Printing Typographical errors and model...

Страница 2: ...s or from negligent operation or assembly even if this is not expressly stated in this instruction manual In light of our policy of continuous improvement it is possible that details of the product ma...

Страница 3: ...iCP 6 3 4 Switching off the system 7 3 5 Low battery indication iCP 8 3 6 Removing the rechargeable battery pack 8 3 7 Charging the battery pack 9 4 Cabled system system setup 10 4 1 Installing the i...

Страница 4: ...coming into contact with the indicator in the cabin Any modifications done to the system must be approved in writing by the supplier prior to any work being completed It is the sole responsibility of...

Страница 5: ...right side of the cabin mounted onto a side rail 3 on the dashboard Installation of the indicator bracket and support S13 1 2 S5 3 3 2 1 The indicator should be easy to reach and read Please note in...

Страница 6: ...tion the battery pack in the battery holder until the red locking clip shifts up again 4 Close the battery holder until you hear a click 3 3 Connecting and switching on the iCP 1 2 e1 e2 e3 F1 F2 NET...

Страница 7: ...ter 5 seconds all electronics are warmed up and you can start weighing 3 4 Switching off the system 1 2 e1 e2 e3 F1 F2 NET ID CODE PT TOTAL KG LB CLR 3 sec Switch off the indicator by pressing the on...

Страница 8: ...ec The iCP will switch off automatically after 10 minutes FUNCTIONALITY BLUE LED DURING POWERING ON ON for 5 sec FULL BATTERY Flicker time interval Working mode Once every 1 5 sec Sleep mode Once ever...

Страница 9: ...y capacity First position the battery pack inside the charger module then plug the adaptor into the mains voltage Smart charger When the battery is being charged the red LED on the charger is lit Afte...

Страница 10: ...of the cabin mounted onto a side rail 3 on the dashboard Installation of the indicator bracket and support S13 1 2 S5 3 3 2 1 The indicator should be easy to reach and read Please note in this manual...

Страница 11: ...abling example Connector of the iCP connected to the cable of the indicator Always install the cable neatly in a loop so that there will be no kink in the cable Indicator mounted in the cabin USER MAN...

Страница 12: ..._ Black Red Blue Brown EU US READ LABEL ON BACK FOR POWER SUPPLY INDICATOR POWER REGULATOR INSIDE 12 VDC POWER CONVERTER INSIDE 20 100VDC Only possible if indicator is equipped with an integrated vol...

Страница 13: ...n off key for 3 seconds 4 4 Connecting and switching on the iCP 1 2 e1 e2 e3 F1 F2 NET ID CODE PT TOTAL KG LB CLR Start up the indicator Press the on off key OR Switch on the iCP Move the iCP quickly...

Страница 14: ...weighing min 10 C 15 F 0 0 max 40 C 105 F M1 3 5 min OK M1 After 3 to 5 minutes the load cells have reached the operational temperature Don t lift loads before the zero point correction has been execu...

Страница 15: ...if 5 3 OIML OK if 2 Check the zero reading before each weighing Before each weighing it is necessary to check whether the system is unloaded and free If the indicator does not determine the zero poin...

Отзывы: