The size of the hole in the wall for installation complies with the dimension required below.
Requirement of water pipe: left side is for hot water, right side is for cold water.
Water pressure: 0.05Mpa- 1.0Mpa
Best performance at: 0.05Mpa-1.0Mpa
Temperature of water: 5° - 90°C
The required size
of the hole
in the wall is :
Length≥170mm;
Height≥200mm.
The minimum depth
of the e-box is 75mm,
maximum is 100mm.
1.R-box is ready for single
lever wall in mixer. In case
of multifunction valve , please
dismount one of matrix from
below by mounting key.
Drill the installation hole
referring to the drawing of the
hole provided. Then drill
4 positioning holes according
to the positioning marks.
Installation guide
Preparation before installation
Installation guide
75
Connect the inlets of hot and
could water pipes as well
as other function water pipes
to the E-box, tighten with wrench.
1
2
3
1
Teplá voda
Studená
voda
Sealing wall
Testing procedure
2