background image

22

raumplus GmbH 

· 

Dortmunder Straße 35 · 25199 Bremen · Germany · Tel: +49 (0) 421 / 579 50 0 · Fax: +49 (0) 421 / 579 50 11 · www.raumplus.com

A-A

A

A

0 mm

1 mm

1_

DETAIL DRAWING

STOPPER FOR TOP ROLLER

Attention!

 

The stopper for top roller inside the top rail are meant to be stoppoint to stop the door.

 

The ground plate with roller air are 

not

 meant to be the stoppoint for the door and always 

requires space between the bottom roller and the stile to prevent a collision with the door 
and the roller.

The door has to be pressed on the stoppoint at the installation.

Содержание AIR-A S1200

Страница 1: ...Version 1 4 2018 09 13 1 03 3 b Installation easy medium difficult SLIDING DOOR ASSEMBLY INSTALLATION SYSTEM AIR A S1200 c...

Страница 2: ...llation instruction page Detail drawings page Stopper for top track page TOOLS without claim of completeness n Screwdriver set n Rubber mallet n Pencil n Water level n Hack saw n Allen key set n Cordl...

Страница 3: ...cation may cause defects and danger thus endangering the safe fixing of the product as well as the safety of the prospective user The liability of the manufacturer shall be excluded in case of defects...

Страница 4: ...following cases the door system has improperly been installed or maintained the safety and installation instructions have not been followed after improper installation or inadequate fixing e g to par...

Страница 5: ...e profile only use the handle profile or the handle Use the door as instructed MANUAL As defined in the Law of Liability for Products 4 Prod HaftG for the liability of the manufacturer for his product...

Страница 6: ...ds Inventor Bibliothek Profile 14 65 0xx ipt Zeichnung F Technik CAD Standards Inventor Templates Doku Detail Zchng mit Schutzvermerk idw 1_ 10 06 027 2_ 10 06 200 3_ 10 07 215 4_ 10 06 033 10 06 035...

Страница 7: ...0xx 7 1 Querprofil oben S 1200 Air 12 42 0xx 8 2 Laufwagenaufnahme S 1200 10 06 027 9 2 Laufwagen Air 10 06 200 Item list object quantity item item no 1 1 Bottom rail S1200 air 12 26 0xx 2 1 Ground pl...

Страница 8: ...1200 item no 12 01 0xx profile outside profile inside CUTTING MEASURES PROFILES S1200 AIR Door height clear height 60 mm Cross rail length door width 24 mm min max door width 500 mm 1400 mm min max do...

Страница 9: ...9 X X 13mm 1 7 2 3 X 18mm X 12mm 2 3 1 7 X 1 0 12 12 X 23mm X 0 5 X 28mm X X 22mm 1 5 22 DETAIL DRAWING CUTTING MEASURES CUTTING MEASURES HEIGHT S1200 AIR Panel without gasket Panel with gasket...

Страница 10: ...y for glass panels under 10 mm Begin in the center of the lower edge and pull the gasket around the panel Cut the gasket just in front of the corner and pull around Panel with gasket After the profile...

Страница 11: ...l Put the vertical profile in the pick up element and hit the vertical profiles with a rubber hammer Hit the bottom rail with a rubber hammer Align profiles flush and screw the profiles with the frame...

Страница 12: ...12 1_ 2_ Align the profiles with a rubber hammer and straight edge Sliding door S1200 AIR A is completed ASSEMBLY INSTRUCTION ALIGN SLIDING DOOR...

Страница 13: ...NSTRUCTION TOP TRACK Screws and dowels for mounting the top track must be adapted to the respective ground The loading capacity must be at least 60 kg per door Insert accessories as illustrated before...

Страница 14: ...ar door slide the top roller with the pick up element into the mounting rail and mount it Connect pick up element with top roller For larger systems assemble the sliding doors with at least 2 persons...

Страница 15: ...of ground plate masking tape pencil unhinge rear sliding door and mount ground plate INSTALLATION INSTRUCTION ADJUST SLIDING DOOR Level Middle rear bottom rail For larger systems assemble the sliding...

Страница 16: ...face upwards do not tighten yet stopper for top track w o brake For larger systems assemble the sliding doors with at least 2 persons Drill holes in ceiling top of corpus and mount the front top trac...

Страница 17: ...round plate Put in the front door slide the top roller with the pick up element into the mounting rail and mount it INSTALLATION INSTRUCTION ADJUST SECOND SLIDING DOOR Center of front top track insert...

Страница 18: ...STRUCTION POSITION STOPPER Fig front door opened Fig front door closed Designation of stopper position Open the door completely move the stopper right to the top roller and mark the position Before fi...

Страница 19: ...0 60 20 54 31 21 21 6 74 4 5 DETAIL DRAWING SECTION DRAWING S1200 AIR A S1200 AIR A SLIDING DOOR BRAKE S1200 AIR A S1200 AIR A SDB door height room height 80 mm room height door height room height 60...

Страница 20: ...20 A A 26 mm 13 14 12 DETAIL DRAWING TRAVERSING DISTANCE DISCHARGE PASSAGE door width passage width For muli track systems please always consider the overlap clear width clear room height...

Страница 21: ...21 1_ 2_ concave handle Dividing rail DETAIL DRAWING HANDLE OPTIONS...

Страница 22: ...P ROLLER Attention The stopper for top roller inside the top rail are meant to be stoppoint to stop the door The ground plate with roller air are not meant to be the stoppoint for the door and always...

Отзывы: