Warning
Caution
Warning
-
59
-
(
V
)
Installation
steps
of
steering
bar
1
.
Install
the
lower
holding
seat
①
,
steering
tube
②
and upper holding seat
③
.
When tightening the bolt of holding seat, make
ensure the even of clearance .
Attached:bolt torque:20Nm
2.Install the throttle grip unit
The
projection
①
of
throttle
grip
must
correspond
to
the
sunken
part
②
on
the
right
lever seat
when
installation
.
Correct installation of cable and wire is very
necessary for ensuring the safty operation of vehicle.
Refer to chapter 1“wiring diagram of vehicle”
3.Ajusting the free clearance of brake cable
4.Adjusting the toe-in of front wheel
5.Mounting front fedner, bumper, front luggage
carrier.
Содержание RT150ST-A
Страница 1: ...RT150ST A SERVICE MANUAL Chongqing Rato Power Co Ltd RT150ST A...
Страница 16: ...11 Section 6 Electrical diagram of ATV...
Страница 90: ...1 Remove Cylinder head cover 2 Remove bolt shroud assy 3 Remove Spark plug 85...
Страница 91: ...5 Remove Camshaft holder 4 Remove pipe comp inlet 6 Remove Bolt Camshaft assy 86...
Страница 96: ...22 Remove Bolt Cover mission Gear Shaft drive Shaft comp counter Gear find Circlip 91...
Страница 118: ...Our group reserve the right to change structure dimension and parameter of the vehicle s parts without additional notice...