1 | MI_2123: Second water connection - removal and installation
11 / 104
General information
The customer does not need to dismantle the second water pipe that they have
made available for the unit. The second water connection on the unit makes use
of the additional water supply, which means that it is regularly flushed. The con-
nection hose from one of the two water taps (via optional connections) is placed
in the unit and directly connected. The second water connection operates the
hand shower.
Safety instructions
DANGER
High voltages when connecting to the mains power
Danger to life due to high voltage.
n
Disconnect from the power supply.
n
Make sure the unit is disconnected from the power.
CAUTION
Sharp edges on the housing
Risk of cuts on the housing when working in the unit.
Wear protective gloves.
Work steps - installing the second water connection
a
The unit is voltage-free and the electrical compartment is open.
1.
Only valid for table-top units
: Remove the hose from the emergency over-
flow.
Only valid for floor units
: Remove the expanding rivet from the pump board
holder on the bottom of the unit and remove the holder.
2. Open the inlet at the cable entry of the perforation by knocking out the per-
forated sheet using a hammer and screwdriver.
3.
For table-top units:
For gas and electric units with built-in expansion
boards, if the front inlet (6) is already occupied, use the inlet (5) here. Use
the inlet (6) for all other electric units.
5
6
Содержание MI 2123
Страница 8: ...80 00 562 V02 12 2021 RTS Awei ml...
Страница 13: ......
Страница 14: ......
Страница 15: ......
Страница 16: ...80 00 562 V02 12 2021 RTS Awei ml...
Страница 21: ......
Страница 22: ......
Страница 23: ......
Страница 24: ...80 00 562 V02 12 2021 RTS Awei ml...
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ...80 00 562 V02 12 2021 RTS Awei ml...
Страница 34: ...1 MI_2123 2 34 104 2 1 3 4 1 DIN 8675 M20x1 5 A2 2 3 1 3 1 4 1 2 2 2 1 2 n n 2 a 1...
Страница 35: ...1 MI_2123 2 35 104 2 3 6 5 6 5 6 4 5 6 5 6 5 4 1 1 4 6 2 1 1...
Страница 36: ...1 MI_2123 2 36 104 7 7 8 4 7 8 8 7 9 2 8 3 2 1...
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ...80 00 562 V02 12 2021 RTS Awei ml...
Страница 46: ......
Страница 47: ......
Страница 48: ...80 00 562 V02 12 2021 RTS Awei ml...
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ...80 00 562 V02 12 2021 RTS Awei ml...
Страница 58: ...1 MI_2123 58 104 f SR 60 77 082 2 1 3 4 1 2 DIN 8675 M20x1 5 A2 3 1 3 1 4 1...
Страница 59: ...1 MI_2123 59 104 n n a 1 2 3 6 5 6 5 6...
Страница 60: ...1 MI_2123 60 104 4 5 6 5 6 5 4 1 1 4 6 1 1 7 7 8 4 7 8 8 7 9 2 8 3 1...
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ...80 00 562 V02 12 2021 RTS Awei ml...
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ...80 00 562 V02 12 2021 RTS Awei ml...
Страница 78: ......
Страница 79: ......
Страница 80: ...80 00 562 V02 12 2021 RTS Awei ml...
Страница 82: ...1 MI_2123 82 104 SR 60 77 082 2 1 3 4 1 DIN 8675 M20x1 5 A2 2x 3 1x 3 1x 4...
Страница 83: ...1 MI_2123 83 104 n n a 1 2...
Страница 84: ...1 MI_2123 84 104 3 6 5 6 5 6 4 5 6 5 6 5 4 1 1 4 6 1 1...
Страница 85: ...1 MI_2123 85 104 7 8 7 4 7 8 8 7 9 2 8 3 1...
Страница 86: ......
Страница 87: ......
Страница 88: ...80 00 562 V02 12 2021 RTS Awei ml...
Страница 93: ......
Страница 94: ......
Страница 95: ......
Страница 96: ...80 00 562 V02 12 2021 RTS Awei ml...
Страница 101: ......
Страница 102: ......
Страница 103: ......
Страница 104: ...80 00 562 V02 12 2021 RTS Awei ml...