11
Power Meter Quick Setup Guide
QSG-PMM-0
B
-E
255-64-0004-00
Configuring Power Meters and Branch Circuit Monitors
You can configure your product with a spreadsheet, or in the product's web interface.
To configure with a spreadsheet:
Go to Raritan.com and download the configuration spreadsheet from the BCM2 Support page. Follow the instructions in the
spreadsheet.
To configure with the product web interface:
Make a network connection to the product. See
Login and Configuration
(on page 10). Follow the instructions in this guide, starting
with
Configure Using the Web Interface
(on page 11).
Configure Using the Web Interface
Scan Power Meters
1
Go to the Dashboard.
2
Click Scan Power
Meters.
3
Click the power meter
or panel in the
discovered list.
Types:
PM: 3-phase
Panel: BCM
4
Click Configure.