
82
P
ARAGON
II U
SER
M
ANUAL
Multi-Tier Installation
In a multi-tier configuration, the order of powering ON is critical to proper function.
•
Last tier switches must be powered ON before the intermediate level of tier
•
Intermediate tier switches must be powered ON before the base Paragon II unit can be powered ON.
•
User Stations (UST1s) can be powered ON and OFF at any time as needed.
•
There is a five-second ON/OFF down time in the UST1 or Paragon II power cycle.
Содержание II
Страница 1: ...User Manual Paragon II...
Страница 2: ...This page intentionally left blank...
Страница 4: ...This page intentionally left blank...
Страница 6: ......
Страница 12: ...2 PARAGON II USER MANUAL Product Photos Figure 1 Paragon II Base Units Figure 2 P2 UMT832 P2 UST and P2CIM PS2...
Страница 16: ...6 PARAGON II USER MANUAL 1 3 4 5 6 7 8 2 Optional Figure 3 Installation Diagram...
Страница 76: ...66 PARAGON II USER MANUAL...
Страница 78: ...68 PARAGON II USER MANUAL...
Страница 88: ...78 PARAGON II USER MANUAL...
Страница 90: ...80 PARAGON II USER MANUAL...
Страница 96: ...86 PARAGON II USER MANUAL 255 30 6000...